Inspections for the day of: Thursday, September 27, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02920 BLD-Wall cover9/26/20019/27/20019/27/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/26/2001 at 07:21:02. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/27/2001 at 05:07:57.
BLD01-00986 BLD-Conference9/26/20019/27/20019/27/2001 12:00:00 AMAPASS
###-#### rod
BLD99-01599 BLD-Final9/26/20019/27/20019/27/2001 12:00:00 AMAFAIL
pat ###-#### need sd back bld. 9/27/2001 11:28:09 AM
BLD01-00335 BLD-Framing/Rough-in9/26/20019/27/20019/27/2001 12:00:00 AMAPASS
robert ###-#### shear panel nailling ok 9/26/2001 5:51:00 PM
BLD01-00038 BLD-Framing/Rough-in9/26/20019/27/20019/27/2001 12:00:00 AMAPASS
SHEER WALL ###-#### SCOTT nailling per approved plan 9/28/2001 2:53:04 PM
MIS01-00199 BLD-Final9/26/20019/27/20019/27/2001 12:00:00 AMPPASS
after 1:30 ###-#### or ###-#### perform idems. 9/27/2001 6:25:19 PM
BLD00-02920 BLD-Wall cover9/27/20019/27/20019/27/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/27/2001 at 05:06:22. Contact: ###-####. basement ceilling/ south fur out wall north side. 9/27/2001 6:27:05 PM
BLD01-00273 BLD-Final9/27/20019/27/20019/27/2001 12:00:00 AMPFAIL
###-#### wayne fire fn-pending fire insp door hardware 9/27/2001 6:24:41 PM
BLD01-00955 BLD-Final9/27/20019/27/20019/27/2001 12:00:00 AMPPASS
###-#### final ok cathy to issue l/c. 9/27/2001 2:16:32 PM
BLD00-03428 BLD-Footing9/25/20019/27/20019/27/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/25/2001 at 12:06:07. Contact: . wip 9/28/2001 10:02:15 AM