BLD01-01790
| BLD-Final | 9/26/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | A | FAIL |
|
|
Don Bryan, ###-#### - call 1st ok for temp occ...c/n: complete work at womens rest rm per approved & filed resubmittal, obtain plbg ok. 9/27/2001 10:31:25 AM
|
BLD01-02529
| BLD-Foundation | 9/26/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | A | PART |
|
|
mark ###-#### has the paperwork you needed ...verify holdown bolts/assy at frame. completed detail req'd. 9/27/2001 11:32:09 AM
|
BLD01-02267
| BLD-Footing | 9/26/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | A | FAIL |
|
|
larry ###-#### c/n issued, pour at own risk; verify ACHD ok for work at sidewalk/public way. ftg steel appears ok per plans. spec insp reqd for struct frame & fireproofing. 9/27/2001 11:28:28 AM
|
BLD01-02529
| BLD-Conference | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/27/2001 9:15:17 AM w/ Mark...need complete detail for concrete beams or deletion; will advise when ready.
|
BLD01-01204
| BLD-Conference | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/27/2001 9:26:14 AM w/ Tim re boiler rm door & penetrations
|
BLD01-01992
| BLD-Conference | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/27/2001 9:34:39 AM w/ Bob Eason re concrete insp & found modification
|
BLD01-01867
| BLD-Conference | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/27/2001 10:32:41 AM need resubmittal for proposed changes at entry door to corridor.
|
BLD01-02267
| BLD-Foundation | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | P | PART |
|
|
###-#### proceed at own risk pending letter fromm CCDC or ACHD re sidewalks; keep c/n 9/27/2001 2:49:54 PM
|
BLD01-02622
| BLD-Conference | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 9/27/2001 2:51:46 PM issued SWO w/ dbl fee on 5th fl remodel
|
BLD00-03538
| BLD-Concrete | 9/25/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 17:34:18. Contact: ###-####.pend insp report 9/27/2001 2:50:21 PM
|
BLD01-01600
| BLD-Framing/Rough-in | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | P | FAIL |
|
|
###-#### CHARLIE c/n: substitution of members (3x or PSL cols, etc.).., install all hdwe; nailing basically ok to start siding. 9/27/2001 4:27:19 PM
|
BLD01-00394
| BLD-Final | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | P | PASS |
|
|
###-#### TIM ok for c/o...verify code enf & ACHD 9/27/2001 5:02:28 PM
|
BLD01-01837
| BLD-Framing/Rough-in | 9/27/2001 | 9/27/2001 | 9/27/2001 12:00:00 AM | P | CANC |
|
|
shear wall david ###-#### previously stickered ok for shear 9/27/2001 3:26:20 PM
|