Inspections for the day of: Friday, September 27, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02964 Sprinkler (Final)9/26/20029/27/20029/27/2002 12:00:00 AMAPASS
cass -###-#### this water service is only about 18" deep , when the water service is replaced in the future the shut off and drain valve will need to be lowered. 9/27/2002 10:55:08 AM
PLM02-02641 Water and/or Sewer9/26/20029/27/20029/27/2002 12:00:00 AMAPART
interceptor test they had to reset the grease interceptor up 8". the water test on the interceptor is ok but all the piping in the area still needs to be reinstalled to the new elevations and grades need to be established on the portions covered without inspections and tested, could still need to be remover and reinstalled from building to main. 9/27/2002 11:22:54 AM
PLM02-02965 Sprinkler (Final)9/26/20029/27/20029/27/2002 12:00:00 AMAPASS
dave- ###-####
PLM02-02966 Water and/or Sewer9/26/20029/27/20029/27/2002 12:00:00 AMAPASS
keith - ###-#### final ok with clean fill 9/27/2002 10:23:21 AM
PLM02-02953 Water and/or Sewer9/27/20029/27/20029/27/2002 12:00:00 AMAPART
tie ins ok just need dcva test and thermol expantion protection, its on the mezanine
PLM02-01685 Final9/27/20029/27/20029/27/2002 12:00:00 AMPPASS
charlie ###-####
PLM02-00906 Plumbing Rough-in9/27/20029/27/20029/27/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/27/2002 at 11:26:01. Contact: ###-####. 2nd and 3rd break sinks by main restroom 9/27/2002 3:33:16 PM
PLM02-00906 Roof Drains9/27/20029/27/20029/27/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/27/2002 at 11:26:27. Contact: ###-####. 3" rd and of by 2rd floor restrooms 9/27/2002 3:33:50 PM