BLD02-02028
| BLD-Conference | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
TIM ; Phone #: ###-#### Internet Inspection Request from: Darla Downs...install auto flush bolts at dbl doors 9/27/2002 2:52:06 PM
|
BLD02-00926
| BLD-Final | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 11:48:58. Contact: ###-####. final ok 9/27/2002 11:25:23 AM
|
BLD02-02133
| BLD-Framing/Rough-in | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | FAIL |
|
|
insp card in gar- tim- ###-####-call 1st before insp ...no plans, need earth/wood separation (or flashing 9/27/2002 9:42:09 AM
|
BLD02-02284
| BLD-Footing | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 17:06:37. Contact: ###-####.
|
BLD02-00798
| BLD-Framing/Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung... soffit ok pending truss eng's ok; complete fireblocks, chk at grid insp. 9/29/2002 3:40:49 PM
|
BLD02-00542
| BLD-Conference | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 10:54:22. Contact: .need verify roof diaphragm 9/27/2002 3:52:13 PM
|
BLD02-00542
| BLD-Concrete | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PART |
|
|
moment frame ftg ok
|
MEC02-02639
| Final | 9/26/2002 | 9/27/2002 | 9/26/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 11:33:13. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/26/2002 at 14:04:05.
|