Inspections for the day of: Friday, September 27, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02028 BLD-Conference9/26/20029/27/20029/27/2002 12:00:00 AMAPASS
TIM ; Phone #: ###-#### Internet Inspection Request from: Darla Downs...install auto flush bolts at dbl doors 9/27/2002 2:52:06 PM
BLD02-00926 BLD-Final9/26/20029/27/20029/27/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/26/2002 at 11:48:58. Contact: ###-####. final ok 9/27/2002 11:25:23 AM
BLD02-02133 BLD-Framing/Rough-in9/26/20029/27/20029/27/2002 12:00:00 AMAFAIL
insp card in gar- tim- ###-####-call 1st before insp ...no plans, need earth/wood separation (or flashing 9/27/2002 9:42:09 AM
BLD02-02284 BLD-Footing9/26/20029/27/20029/27/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/26/2002 at 17:06:37. Contact: ###-####.
BLD02-00798 BLD-Framing/Rough-in9/27/20029/27/20029/27/2002 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung... soffit ok pending truss eng's ok; complete fireblocks, chk at grid insp. 9/29/2002 3:40:49 PM
BLD02-00542 BLD-Conference9/27/20029/27/20029/27/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/27/2002 at 10:54:22. Contact: .need verify roof diaphragm 9/27/2002 3:52:13 PM
BLD02-00542 BLD-Concrete9/27/20029/27/20029/27/2002 12:00:00 AMPPART
moment frame ftg ok
MEC02-02639 Final9/26/20029/27/20029/26/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/26/2002 at 11:33:13. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/26/2002 at 14:04:05.