MEC02-02732
| Final | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
Furnace located at exterior access west side of foundation in crawl space. 9/26/2002 2:24:56 PM
|
MEC02-02286
| Rough-in | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
INSPECTION PERFORMED ON 9-26-02 PM BY ALAN HOUSER. THANK YOU!; Phone #: ###-#### Internet Inspection Request from: Amanda Van Paepeghem
|
MEC02-02085
| Conference | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
meet with plbg. about water heater, need imformation on venting from manufacture, before installation 9/27/2002 1:33:28 PM
|
MEC02-02589
| Rough-in | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 16:33:14. Contact: ###-####.
|
MEC02-01449
| Final | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-02766
| Pressure Test | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
PLEASE INSPECT LAST THING IN MORNING. SHOULD BE READY BY 11:00.
CALL US WHEN YOU ARE HEADED THAT WAY
THANKS
CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
MEC02-02735
| Final | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
PLEASE INSPECT AT 1:30PM.
THANKS
CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
MEC02-02767
| Final | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
early PM if possible, TML installer on site; Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
MEC02-02760
| Pressure Test | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
MEC02-02620
| Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 09:10:47. Contact: ###-####.
|
MEC02-02620
| Pressure Test | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 09:11:32. Contact: ###-####.
|
MEC02-01543
| Final | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | FAIL |
|
|
no answer 9/27/2002 6:49:09 PM
|
MEC02-02770
| Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
Please rough in and pressure witness. Call Denton w/ questions. Thanks!!; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
MEC02-02596
| Pressure Test | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
Scheduling pressure test and final for the same time.; Phone #: ###-#### Internet Inspection Request from: Lisa Whitney
|
MEC02-02596
| Final | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
Scheduling pressure test and final for the same time.; Phone #: ###-#### Internet Inspection Request from: Lisa Whitney
|
MEC02-02545
| Final | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | FAIL |
|
|
c/n at front door 9/27/2002 7:21:36 PM
|