MEC02-02745
| Rough-in | 9/25/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | NR |
|
|
Work not complete. Note: Section 116.6 of the 1997 UMC. A reinspection fee may be assessed , for each inspection or reinspection when such portion of work for which inspection is requested is not complete. 9/27/2002 11:06:37 AM
|
MEC02-02747
| Final | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 15:32:06. Contact: ###-####.
|
BLD02-02311
| BLD-Foundation | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 15:32:09. Contact: ###-####.
|
MEC02-02570
| Rough-in | 9/26/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-01794
| BLD-Final | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 07:05:37. Contact: ###-####.. needs mec /fire/electrical prior to a final structural. 9/27/2002 3:29:23 PM
|
BLD02-01959
| BLD-Final | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | NR |
|
|
gary ###-####. This needs a plumbing and electrical final. 9/27/2002 1:32:53 PM
|
BLD02-01802
| BLD-Framing/Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | FAIL |
|
|
###-####c/n posted. 9/27/2002 3:29:36 PM
|
BLD02-01856
| BLD-Framing/Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PART |
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieok to add soffit to roof area,(deck under not complete). will be exposed for final also need plans. as they are locked in garage. 9/27/2002 1:34:32 PM
|
BLD02-00331
| BLD-Framing/Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 10:09:24. Contact: ###-####.
|
BLD02-01277
| BLD-Framing/Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 12:00:00 AM | P | PASS |
|
|
lee; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|