Inspections for the day of: Tuesday, September 27, 2005.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-02130 Final9/26/20059/27/20059/27/2005 4:39:19 PMPPASS
Scheduled by a contractor via Hello! on 9/26/2005 at 8:13:38 AM. Contact: ###-####. ok to final
ELE05-03509 Final9/27/20059/27/20059/27/2005 4:25:36 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dana Moyer ok to final
ELE05-03153 Final9/27/20059/27/20059/27/2005 3:39:31 PMPPASS
###-#### - john ok to final
ELE05-03512 Electrical Rough-In9/27/20059/27/20059/27/2005 2:30:31 PMPNH
###-#### - john nh, called contr, they said back door open, but all locked up. can't get in new addition, painter masked off and painting. told contr to call back in.
ELE05-03515 Permanent Service9/27/20059/27/20059/27/2005 1:48:57 PMPPASS
chuck ###-#### p/s ug re-connect exst ok
ELE05-02217 Electrical Rough-In9/27/20059/27/20059/27/2005 1:47:18 PMPPART
Scheduled by a contractor via Hello! on 9/27/2005 at 9:21:07 AM. Contact: ###-####. ok to cover u/g corner 8th and broad, and 2 south light pole bases ne corner on capitol
ELE05-03494 Permanent Service9/26/20059/27/20059/27/2005 12:44:17 PMPPASS
mike --###-#### p/s u/g reconnect ok
ELE05-02369 Final9/26/20059/27/20059/27/2005 11:45:24 AMAPASS
Scheduled by a contractor via Hello! on 9/26/2005 at 8:10:35 AM. Contact: ###-####. ok to final
ELE05-02910 Final9/26/20059/27/20059/27/2005 10:00:46 AMAPASS
Scheduled by a contractor via Hello! on 9/26/2005 at 3:11:52 PM. Contact: ###-####. ok to final
ELE05-01931 Rough-In Permanent Service9/27/20059/27/20059/27/2005 9:44:01 AMPCANC
Scheduled by a contractor via Hello! on 9/27/2005 at 8:00:01 AM. see p/s
ELE05-01346 Final9/26/20059/27/20059/27/2005 9:38:06 AMAPASS
Scheduled by a contractor via Hello! on 9/26/2005 at 12:39:45 PM. Contact: ###-####. corrections made, ok to final
ELE05-03472 Electrical Rough-In9/27/20059/27/20059/27/2005 9:14:19 AMAPASS
Underground inspection request; Phone #: ###-#### Internet Inspection Request from: Nikki Day u/g from new future tlr power source and comm ok to cove( se part of lot)
ELE05-03104 Electrical Rough-In9/26/20059/27/20059/27/2005 8:46:03 AMAPASS
R/I FOR COVER IN LAB AREA. BRAD IS ELECT. LH Internet Inspection Request from: BRIAN KEITH ok to cover walls only lab area
ELE05-03502 Electrical Rough-In9/26/20059/27/20059/27/2005 8:15:48 AMACANC
###-#### - roger see rip
ELE05-03502 Rough-In Permanent Service9/26/20059/27/20059/27/2005 8:15:14 AMAPASS
###-#### - roger called contr for gec abrasion protect, 11/4". ric ok, p/s u/g n ok
ELE05-01931 Permanent Service9/27/20059/27/20059/27/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/27/2005 at 8:00:01 AM. called contr, said to identify meter for house panel. p/s u/g n ok