BLD04-02993
| FIRE-Final Inspection | 9/26/2005 | 9/27/2005 | 9/27/2005 4:20:58 PM | P | CANC |
|
|
Contractor was not ready for inspection.
|
BLD05-02155
| FIRE-Final Inspection | 9/26/2005 | 9/27/2005 | 9/27/2005 3:48:03 PM | A | CANC |
|
|
Job is not ready for inspection
|
FIR05-00584
| INSP-Sprinkler Rough-in | 9/27/2005 | 9/27/2005 | 9/27/2005 3:40:02 PM | P | FAIL |
|
|
Fitters are still installing piping
|
FIR03-00091
| INSP-Final Inspection | 9/27/2005 | 9/27/2005 | 9/27/2005 3:25:46 PM | P | PASS |
|
|
Permit finaled
|
FIR05-00556
| INSP-Sprinkler Rough-in/Hydro | 9/26/2005 | 9/27/2005 | 9/27/2005 11:27:41 AM | A | PART |
|
|
Underground hydro passed. Sprinkler rough-in passed except that the wrong upright sprinkler heads have beem installed. If heads remain resubmittals will be required and the overhead hydro will be passed. If the heads are changed out to the VK200's as per plan then the hydro needs redone.
|
FIR03-00091
| FIR-Aging Inspection | 9/27/2005 | 9/27/2005 | 9/27/2005 9:59:47 AM | | CANC |
|
|
permit finaled
|
FIR05-00584
| INSP-Final Inspection | 9/26/2005 | 9/27/2005 | 9/27/2005 9:40:22 AM | A | FAIL |
|
|
Work not started yet. To be rescheduled for afternoon
|
BLD05-02005
| FIRE-Final Inspection | 9/26/2005 | 9/27/2005 | 9/27/2005 9:37:16 AM | A | PASS |
|
|
Fire life safety finaled
|