FIR07-00317
| FIR-Aging Inspection | 9/27/2007 | 9/27/2007 | 10/1/2007 12:18:49 PM | | DEFR |
|
|
wip
|
FIR07-00566
| INSP-Final Inspection | 9/25/2007 | 9/27/2007 | 9/27/2007 11:28:25 AM | A | CANC |
|
|
Inspection to be rescheduled.
|
FIR07-00235
| INSP-Sprinkler Rough-in | 9/26/2007 | 9/27/2007 | 9/27/2007 11:22:10 AM | A | PART |
|
|
Still missing tenting at the 3rd floor east apt., one head is still overspaced at the 2nd floor east unit, remainder of corrections have been completed as noted on plans, OH hydro was not ready for inspection.
|
FIR07-00489
| INSP-Final Inspection | 9/25/2007 | 9/27/2007 | 9/27/2007 11:00:15 AM | A | NR |
|
|
Project is not ready for final inspection per conversation with contractor, to be rescheduled.
|
FIR07-00693
| INSP-Final Inspection | 9/25/2007 | 9/27/2007 | 9/27/2007 9:51:52 AM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|