ESC10-00540
| Site Preparation | 9/27/2010 | 9/27/2010 | 9/28/2010 2:03:23 PM | | NR |
|
|
|
BLD10-02256
| BLD-Final | 9/27/2010 | 9/27/2010 | 9/27/2010 2:02:49 PM | P | PASS |
|
|
sheryl Phone #: ###-#### ok to cover with plm insp. aproval.
|
ESC10-00008
| General Inspection | 9/27/2010 | 9/27/2010 | 9/27/2010 2:01:37 PM | P | PART |
|
|
Talked to contractor, CUP paperwork was submitted to Boise City on 8/29.
|
BLD10-00429
| BLD-Conference | 9/27/2010 | 9/27/2010 | 9/27/2010 2:01:15 PM | P | PASS |
|
|
Talked to contractor, CUP paperwork was submitted to Boise City on 8/29.
|
BLD10-01364
| BLD-Conference | 9/27/2010 | 9/27/2010 | 9/27/2010 10:35:44 AM | A | PASS |
|
|
needed ele permit and is now grouped to permit after call to inforn contractor.
|
ESC10-00404
| Random Inspection | 9/27/2010 | 9/27/2010 | 9/27/2010 10:34:36 AM | A | PASS |
|
|
appears ok
|
BLD10-02224
| BLD-Footing | 9/24/2010 | 9/27/2010 | 9/27/2010 10:17:24 AM | A | PASS |
|
|
Colin Phone #: ###-####
|
ESC10-00719
| Random Inspection | 9/27/2010 | 9/27/2010 | 9/27/2010 10:16:52 AM | A | FAIL |
|
|
Remove sheet rock debris pil. Provide a container for trash debris or place it within an area out of the weather
|