BLD07-02736
| BLD-Final | 8/31/2011 | 9/27/2011 | 10/7/2011 8:01:40 AM | A | NR |
|
|
|
ESC11-00355
| General Inspection | 9/27/2011 | 9/27/2011 | 9/27/2011 10:54:07 PM | P | PASS |
|
|
|
BLD11-01350
| BLD-Framing/Rough-in | 9/26/2011 | 9/27/2011 | 9/27/2011 4:51:13 PM | P | PART |
|
|
Zach Phone #: ###-####,, correction posted,, ok to insulate
|
BLD11-01559
| BLD-Framing/Rough-in | 9/27/2011 | 9/27/2011 | 9/27/2011 4:28:31 PM | P | PART |
|
|
Doug Phone #: ###-####,, correction posted,,, need to verify mechanical pass prior to insulation
|
BLD11-00416
| BLD-Other | 9/27/2011 | 9/27/2011 | 9/27/2011 3:35:44 PM | P | PASS |
|
|
john - ceiling grid Phone #: ###-####
|
BLD11-01942
| BLD-Conference | 9/27/2011 | 9/27/2011 | 9/27/2011 2:44:16 PM | P | PART |
|
|
Bob Phone #: ###-####,, ok to use battery powered detectors due to no attic
|
BLD11-01715
| BLD-Other | 9/26/2011 | 9/27/2011 | 9/27/2011 1:33:56 PM | A | PASS |
|
|
dan - ceiling grid Phone #: ###-####
|
BLD11-01080
| BLD-Framing/Rough-in | 9/26/2011 | 9/27/2011 | 9/27/2011 12:59:57 PM | A | PART |
|
|
Mike or ###-#### Luke Phone #: ###-####,, ok to insulate main and upper floor,, and garage,, verify mech in garage prior to cover
|
BLD11-02232
| BLD-Foundation | 9/26/2011 | 9/27/2011 | 9/27/2011 12:11:07 PM | A | PASS |
|
|
John Phone #: ###-####
|
BLD11-01284
| BLD-Final | 9/26/2011 | 9/27/2011 | 9/27/2011 11:32:42 AM | A | PASS |
|
|
micah Phone #: ###-####
|
BLD11-01284
| DOC - Permit Finaled | 9/27/2011 | 9/27/2011 | 9/27/2011 11:31:51 AM | P | PASS |
|
|
c of o issued
|
BLD11-01350
| BLD-Framing/Rough-in | 9/26/2011 | 9/27/2011 | 9/27/2011 10:14:50 AM | A | NR |
|
|
Zack Phone #: ###-####
|
BLD11-01944
| BLD-Framing/Rough-in | 9/26/2011 | 9/27/2011 | 9/27/2011 12:00:00 AM | P | CANC |
|
|
matt Phone #: ###-####
|