Inspections for the day of: Tuesday, September 27, 2011.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE11-02049 Conference9/27/20119/27/20119/27/2011 5:31:36 PMPPASS
rachel - please call 1/2 hr prior Phone #: ###-#### Talk with home owner about the addition to there familyroom,wire sizes,box fill,free wire,stapling 1 1/4 from edge of framing member,nail plates,receptacle spacing,
ELE11-01716 Conference9/27/20119/27/20119/27/2011 4:00:46 PMPPASS
Jim Phone #: ###-#### Did walk thourgh with electrical contractor on job site, discussed size of grounding electrode conductor, Bonding
ELE11-02194 Electrical Rough-In9/23/20119/27/20119/27/2011 2:14:26 PMPPASS
Addition in the back. Phone #: ###-#### >> Inspection requested via web by Greg Idsinga rough-in ok cover addition
ELE11-01550 Electrical Rough-In9/27/20119/27/20119/27/2011 2:05:57 PMPPASS
U/G COUNDUIT INSPECTION ONLY....FOR HOT TUB IN BACK YARD Phone #: ###-#### >> Inspection requested via web by Bob Glenn rough-in ok cover trench
ELE11-01654 Final9/23/20119/27/20119/27/2011 10:04:11 AMAPASS
Mike Phone #: ###-#### final ok
GCE11-00111 GCE-Rough-In9/26/20119/27/20119/27/2011 9:02:31 AMAPASS
Please call at least 30 mins prior to inspection Heath Reader @###-#### rough-in ok cover trench
GCE11-00117 GCE-Final9/26/20119/27/20119/27/2011 7:47:09 AMAPASS
Rober @ ###-#### (Mandatory Inspection) final ok