Inspections for the day of: Tuesday, September 27, 2011.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00397 Aging Inspection9/21/20119/21/2011   
ESC11-00551 Site Final9/27/20119/27/20119/27/2011 3:34:57 PMPCANC
ESC11-00656 Site Preparation9/27/20119/27/20119/27/2011 2:44:00 PMPPASS
BLD11-02206 BLD-Footing9/27/20119/27/20119/27/2011 2:43:40 PMPPART
Shane Phone #: ###-####. work in progress.
BLD11-02288 BLD-Conference9/26/20119/27/20119/27/2011 1:56:17 PMPFAIL
Call 30 min prior----Devin Phone #: ###-####. Resubmit plan for 2nd warehouse to match existing conditions, remove all tumbturns and provide lever type hardware at exterior doors.
BLD11-01251 BLD-Framing/Rough-in9/26/20119/27/20119/27/2011 10:28:15 AMAPART
steel stud framing//Rob Phone #: ###-####. Interior steel stud walls only ok to cover. Need framing details for barrell ceiling. Aslo need to verifiy additional holdowns at extrior shear wall locations.
ESC11-00398 General Inspection9/27/20119/27/20119/27/2011 10:24:48 AMAPASS
BLD11-01300 BLD-Conference9/26/20119/27/20119/27/2011 9:55:57 AMADONE
After 9:00 am please. Went over ICF ES evaluation report and code issues with contractor.
BLD11-02288 BLD-Final9/26/20119/27/20119/27/2011 12:00:00 AMACANC
call 30 min notice//Devin Phone #: ###-####