BLD12-00612
| FIRE-Final Inspection | 9/25/2012 | 9/27/2012 | 9/27/2012 3:51:24 PM | P | PASS |
|
|
Life safety passed
|
FIR12-00490
| INSP-Sprinkler Rough-in | 9/26/2012 | 9/27/2012 | 9/27/2012 3:40:49 PM | P | PASS |
|
|
Underground supply line is ok to cover. I noted that two additional (four total) 45 degree fittings have been installed and will need to be included in the hydraulic calculations for the overhead sprinkler system.
|
FIR12-00174
| INSP-Sprinkler Rough-in | 9/27/2012 | 9/27/2012 | 9/27/2012 2:39:19 PM | P | PART |
|
|
Sprinkler rough-in is passed but the sprinkler heads in the corridor as shown on the plans are to be large orfice but as installed are not. I spoke to Jim and he is going to address this issue with Tim Frost.
|
FIR12-00288
| INSP-Sprinkler Rough-in | 9/25/2012 | 9/27/2012 | 9/27/2012 2:26:52 PM | A | PART |
|
|
Sprinkler piping above lay-in ceiling tle can be covered. Issues that need addressed prior to a final sign off are missing upright head at one location, overspaced upright heads at another location, standard responce (existing) pendants installed in rooms where per the plans the heads are to be changed to quick responce, standard and quick responce heads mixed in the same compartment and areas with no sprinkler protection due to soffits. Ceiling plans does not match either due to ceilings installed where none were shown and soffits/low ceilings that have either been deleted or relocated. Contact plan review for guidance on resubmittals/as-builts.
|
FIR12-00469
| INSP-Final Inspection | 9/27/2012 | 9/27/2012 | 9/27/2012 2:13:27 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00459
| INSP-Final Inspection | 9/27/2012 | 9/27/2012 | 9/27/2012 2:12:15 PM | P | FAIL |
|
|
All ceiling tile and sprinkler canopies have not been installed yet
|
FIR11-00435
| INSP-Final Inspection | 9/26/2012 | 9/27/2012 | 9/27/2012 9:37:45 AM | A | CANC |
|
|
I spoke to Brian Giacomino about the plans needing to be resubmitted due to device change out and new NAC panel installation.
|
FIR12-00174
| FIR-Aging Inspection | 9/27/2012 | 9/27/2012 | 9/27/2012 9:02:44 AM | | PASS |
|
|
Rough-in inspection scheduled
|
BLD12-01141
| FIRE-Final Inspection | 9/27/2012 | 9/27/2012 | 9/27/2012 8:27:52 AM | P | PART |
|
|
Life safety passed. Exit signs being used are "nuclear" type. They have no obvious expiration date but do have the UL stamp.
Waiting for Phase 2 per Troy Cobbley
|
FIR12-00473
| INSP-Final Inspection | 9/26/2012 | 9/27/2012 | 9/27/2012 8:26:43 AM | A | PASS |
|
|
Permit finaled. Trouble conditions on the fire alarm panel have been cleared.
|
FIR12-00362
| INSP-Final Inspection | 9/26/2012 | 9/27/2012 | 9/27/2012 8:26:06 AM | A | PART |
|
|
Permit finaled. Hanger has been added. Waiting for Phase 2 per Troy Cobbley
|
FIR12-00133
| INSP-Final Inspection | 9/27/2012 | 9/27/2012 | 9/27/2012 8:24:04 AM | P | PASS |
|
|
Permit finaled under FIR12-00405
|
FIR12-00133
| FIR-Aging Inspection | 9/27/2012 | 9/27/2012 | 9/27/2012 8:23:44 AM | | PASS |
|
|
Permit finaled under FIR12-00405
|
BLD12-02291
| FIRE-Final Inspection | 9/26/2012 | 9/27/2012 | 9/26/2012 1:43:36 PM | A | PASS |
|
|
life safety passed
|