ELE19-03465
| Final | 9/27/2019 | 9/27/2019 | 9/27/2019 9:39:22 PM | P | FAIL |
|
|
Teddy Phone #: ###-#### GFI breaker hot neutral reverse. Pump not functioning properly. Recepts and lights blanked off as per code. Will need to re-inspect once correction is made.
|
ELE19-03502
| Final | 9/26/2019 | 9/27/2019 | 9/27/2019 2:04:58 PM | A | PASS |
|
|
ready for, id pwr came back disconnected so they could cut tree down, took up excess slack so have clearance now Phone #: ###-#### Inspection requested via web by dennis mcneely Ok final. Service drop needed slack taken out to allow a code compliant height after disconnect of power for tree trimming. IDP re-energized.
|
ELE19-00853
| Final | 9/27/2019 | 9/27/2019 | 9/27/2019 1:34:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Ok final.
|
ELE19-01167
| Final | 9/27/2019 | 9/27/2019 | 9/27/2019 1:34:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Ok final. This to close out permit. Intersystem installed.
|
ELE19-02475
| Final | 9/26/2019 | 9/27/2019 | 9/27/2019 1:32:07 PM | A | NR |
|
|
Garage code is 7352 enter Phone #: ###-#### Inspection requested via web by Zane Robertson Hall recepts and lights not working.
|
ELE19-02260
| Final | 9/27/2019 | 9/27/2019 | 9/27/2019 12:24:15 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok final garage and ADU
|
ELE19-03191
| Permanent Service | 9/26/2019 | 9/27/2019 | 9/27/2019 12:23:49 PM | P | PASS |
|
|
May not need the PM give me a call if you are in the area. Thanks Phone #: ###-#### Inspection requested via web by Aaron Mace 2 grd rods. p/s o/h n ok
|
ELE19-00728
| Final | 9/27/2019 | 9/27/2019 | 9/27/2019 12:23:14 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Talked to Alan, going to coordinate with Aurora for final inspection.
|
ELE19-00365
| Final | 9/26/2019 | 9/27/2019 | 9/27/2019 11:24:50 AM | A | PASS |
|
|
This is 1812 1/2 address. Entrance is in the ally. There is a key under the mat. Call Chaz with any questions at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final.
|
ELE19-01764
| Final | 9/26/2019 | 9/27/2019 | 9/27/2019 10:41:48 AM | A | PASS |
|
|
Call Brodie @ ###-#### with any questions. Phone #: ###-#### Inspection requested via web by William Salts Ok final.
|
ELE19-01855
| Electrical Rough-In | 9/26/2019 | 9/27/2019 | 9/27/2019 10:41:28 AM | A | PASS |
|
|
Please contact Caleb ###-#### before inspecting. Would like to meet inpector at jobsite. Phone #: ###-#### Inspection requested via web by Caleb Gaylord Ok cover addition.
|
ELE19-01864
| Final | 9/27/2019 | 9/27/2019 | 9/27/2019 10:24:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok final.
|
ELE19-03122
| Electrical Rough-In | 9/26/2019 | 9/27/2019 | 9/27/2019 8:39:54 AM | A | PASS |
|
|
Thomas will be on site ###-#### please call and let him know what time he needs to meet you. Phone #: ###-#### Inspection requested via web by Kilee Russell Inspection was for RI and final. Contractor took panel off and verified correct model number. Ok final. Line side connection on sub panel in garage. 40a fuses.
|
ELE19-03176
| Final | 9/26/2019 | 9/27/2019 | 9/26/2019 6:03:08 PM | A | PASS |
|
|
Please call Brodie with any questions@ ###-#### Phone #: ###-#### Inspection requested via web by William Salts p/s o/h n ok
|