ELE99-03424
| Electrical Rough-In | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | PASS |
|
|
KEVIN-- ###-#### R/I (JMS) P/S U/G N ok
|
ELE99-03425
| Electrical Rough-In | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | PASS |
|
|
KEVIN ###-#### R/I (JMS) P/S U/G N ok
|
ELE99-03431
| Electrical Rough-In | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/27/1999 at 14:47:29. Contact: ###-####. (JMS) Cor. Posted called 210-52 (A) 370-16 (A)
|
ELE99-03288
| Final | 9/28/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | FAIL |
|
|
PAULA ###-#### OFFICE - FRONT OF HOUSE RIGHT SIDE DOUBLE GATE HALF OPEN-REINSPECT talked with homeowner
|
ELE99-03407
| Temporary Service | 9/28/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | PASS |
|
|
TEMP POLE REINSPECTION AND THE OTHER TEMP POLE IS A NEW ONE SKIP ###-#### t/s o/h n
|
ELE99-03467
| Electrical Rough-In | 9/28/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | NR |
|
|
GLENN ###-#### R/I & SER
|
ELE99-03180
| Final | 9/28/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | PASS |
|
|
T/S, U/G, new final ok
|