Inspections for the day of: Tuesday, September 28, 1999.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC99-03121 Final9/23/19999/28/19999/28/1999 7:19:11 AMPPASS
2 FIREPLACES ###-####
BLD99-02301 BLD-Final9/27/19999/28/19999/28/1999 12:00:00 AMAFAIL
GREG-- ###-#### FN OCC INSP-CALL 1ST BEFORE INSP Need life/safety signature
MEC99-01926 Final9/27/19999/28/19999/28/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/27/1999 at 15:14:09. Contact: ###-####.
MEC99-03163 Final9/27/19999/28/19999/28/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/27/1999 at 17:00:21. Contact: ###-####. N/R for final
MEC99-03177 Rough-in9/28/19999/28/19999/28/1999 12:00:00 AMPPASS
martha ###-#### r/i
MEC99-02824 Final9/28/19999/28/19999/28/1999 12:00:00 AMPPASS
martha-- ###-#### fn insp
MEC99-02901 Final9/28/19999/28/19999/28/1999 12:00:00 AMPPASS
KEY ABOVE FRONT DOOR- SANDY- ###-#### FN
MEC99-02554 Final9/28/19999/28/19999/28/1999 12:00:00 AMPFAIL
BILL-- ###-#### FN -RE-INSP Locked, made 2nd trip still failed
MEC99-02536 Final9/28/19999/28/19999/28/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/28/1999 at 10:54:52. Contact: ###-####.
MEC99-02412 Final9/27/19999/28/19999/28/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/27/1999 at 16:08:10. Contact: ###-####. Left C/N
BLD99-01363 BLD-Final9/27/19999/28/19999/28/1999 12:00:00 AMPPASS
REINSPECTION LARRY ###-#### C/C #17998
MEC99-02072 Final9/27/19999/28/19999/28/1999 12:00:00 AMPPASS
kelly ###-####-homeowner ###-####