BLD99-02305
| BLD-Footing | 9/24/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | PART |
|
|
JACK ###-#### FT INSP BCD 3+4 footings ok
|
BLD99-02400
| BLD-Energy code compliance | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | PASS |
|
|
KELLY-- ###-#### ENERGY CODE
|
BLD99-02628
| BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | FAIL |
|
|
WALT ###-#### Rafters not 2 x 8 as per plan
|
BLD99-01785
| BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | PART |
|
|
MARK-- ###-#### MASONARY GROUT INSP Spec insp. On site
|
BLD99-01545
| BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | FAIL |
|
|
ceiling call first don ###-#### To be done by 325
|
BLD99-01503
| BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | A | PASS |
|
|
insulation inspection also / tim ###-####
|
BLD99-02348
| BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/27/1999 at 22:02:11. Contact: ###-####. OK to insulate after Mec. R/I is ok
|
BLD99-01594
| BLD-Framing/Rough-in | 9/28/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | FAIL |
|
|
LARRY ###-#### Ok to insulate
|
BLD99-02741
| BLD-Footing | 9/28/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | PART |
|
|
JERRY ###-#### FT INSP Footing ok
|
BLD99-02769
| BLD-Foundation | 9/28/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | PASS |
|
|
dirk ###-#### ready at 1pm Wall ok
|
BLD99-02208
| BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/27/1999 at 11:43:36. Contact: ###-####.
|