BLD00-00884
| FIRE-Final Inspection | 9/27/2000 | 9/28/2000 | 9/28/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 409 On 9/27/2000 met with Jim Storey and architect; exit door hardware; penetrations; 9/28/2000 4:10:02 PM
|
BLD00-01489
| FIRE-Final Inspection | 9/27/2000 | 9/28/2000 | 9/28/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 17:26:19. Contact: ###-####. should have been final structural
|
FIR00-00472
| INSP-Final Inspection | 9/28/2000 | 9/28/2000 | 9/28/2000 12:00:00 AM | A | PASS |
|
|
|
FIR00-00466
| INSP-Final Inspection | 9/28/2000 | 9/28/2000 | 9/28/2000 12:00:00 AM | A | PASS |
|
|
|
FIR00-00563
| INSP-Sprinkler Rough-in | 9/28/2000 | 9/28/2000 | 9/28/2000 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 409 On 9/28/2000 okay to cover
|
BLD00-02409
| FIRE-Final Inspection | 9/28/2000 | 9/28/2000 | 9/28/2000 12:00:00 AM | P | PASS |
|
|
###-#### told Phil Doble to disable the mag hold opens as smoke detectors weren't installed; door hardware to be ready for Jim Storey 9/29/2000 9:19:13 AM
|
BLD00-02249
| FIRE-Final Inspection | 9/27/2000 | 9/28/2000 | 9/28/2000 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 14:56:51. Contact: ###-####. talked to John Lopez of AEI and alarm plans haven't been submitted yet. will reschedule for later date upon approval 9/29/2000 10:27:24 AM
|