ELE01-03127
| Final | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PASS |
|
|
###-#### ok 9/28/2001 10:42:24 AM
|
ELE01-03296
| Electrical Rough-In | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | NR |
|
|
###-#### DUSTIN contractor will call when ready 9/28/2001 10:12:54 AM
|
ELE01-03370
| Electrical Rough-In | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PASS |
|
|
Room 54 ###-#### walls ok 9/28/2001 9:51:35 AM
|
ELE01-01537
| Electrical Rough-In | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PART |
|
|
r/i troy ###-#### ceiling ok needs to remove receptacles that are above ceilings, all locatins 9/28/2001 11:14:49 AM
|
ELE01-03377
| Final | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 16:29:15. Contact: ###-####. called Alloway job not ready and no access 9/28/2001 12:51:06 PM
|
ELE01-02671
| Final | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 18:58:44. Contact: ###-####. ok 9/28/2001 9:25:00 AM
|
ELE01-03356
| Permanent Service | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | FAIL |
|
|
DAN - ###-#### needs grounding done and address sub panel wiring called A 1 Elect job is a mess 9/28/2001 2:16:36 PM
|
ELE01-02959
| Final | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | FAIL |
|
|
###-#### JOHN corrections not made called, cor. still posted 9/28/2001 2:35:21 PM
|