ELE01-02184
| ELE-Aging Inspection | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | | NR |
|
|
work still in progress. 9/28/2001 9:27:03 AM
|
ELE01-03373
| Electrical Rough-In | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PART |
|
|
walls only rocky ###-####. ok. 9/28/2001 10:56:48 AM
|
ELE01-03380
| Electrical Rough-In | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PASS |
|
|
###-#### JEAN. 2-partion walls r/i, ok. 9/28/2001 9:50:14 AM
|
ELE01-03253
| Temporary Service | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 17:25:40. Contact: ###-####. conference; service panel/meter
installation requirements. 9/28/2001 10:56:01 AM
|
ELE01-01637
| Final | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 17:29:46. Contact: ###-####. temporary occupancy for breakroom, 2-offices, and showroom recepticle outlets. bathrooms and track lighting not completed. 9/28/2001 9:25:20 AM
|
ELE01-03262
| Final | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 06:59:22. Contact: ###-####. bath remodel, ok. 9/28/2001 11:23:42 AM
|
ELE01-00851
| Electrical Rough-In | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | PART |
|
|
shane- ###-#### r/i . pour #9; pvc conduit in decking. 9/28/2001 1:48:05 PM
|
ELE01-02596
| Final | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | PASS |
|
|
fn steve- ###-####. completed. 9/28/2001 4:33:19 PM
|
ELE01-03386
| Electrical Rough-In | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | PASS |
|
|
r/i ed- ###-#### . first floor: livingroom remodel. upstairs: recessed lighs r/i. ok. 9/28/2001 3:14:02 PM
|
ELE01-03009
| Temporary Service | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 403 On 9/28/2001 2:34:12 PM completed installation., t/s oh n #3009-ok
called sharon for connect to power.
|
ELE01-03363
| Temporary Service | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | PASS |
|
|
###-####. temporary service pole,
t/s ug boise basin ele #3363-ok 9/27/2001 2:19:18 PM
|
ELE01-02983
| Permanent Service | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | PASS |
|
|
joe ###-#### recheck. completed. 9/27/2001 1:06:04 PM
|
ELE01-03371
| Temporary Service | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | PASS |
|
|
t/p rick ###-####. temporary service pole.
t/s ug city light ele #3371-ok 9/28/2001 4:53:32 PM
|