FIR01-00387
| INSP-Sprinkler Rough-in/Hydro | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PART |
|
|
hydo's OK. duct & beam blockage to be fixed in crawlspace 9/28/2001 4:59:15 PM
|
BLD01-00171
| FIRE-Final Inspection | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PART |
|
|
OK to occup. new showroom waiting for rough-in on existing 9/28/2001 5:41:50 PM
|
BLD01-00171
| FIRE-Alarm Testing | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | NR |
|
|
approved plans not on site but system is installed. 9/28/2001 5:39:34 PM 9/28/2001 5:40:27 PM
|
FIR01-00139
| INSP-Final Inspection | 9/26/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | A | PASS |
|
|
OK for cert. of comp. on fire alarm 9/28/2001 4:56:29 PM
|
BLD01-01968
| FIRE-Final Inspection | 9/27/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | FAIL |
|
|
###-####. Final fail. See c/n. 10/1/2001 10:27:06 AM
|
FIR01-00492
| INSP-Sprinkler Rough-in | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | FAIL |
|
|
john ###-#### r/i. Tenting not stapled. Heads below stairs not installed. Rough -in OK. 10/1/2001 9:23:13 AM 10/1/2001 9:24:13 AM
|
BLD01-02520
| FIRE-Final Inspection | 9/28/2001 | 9/28/2001 | 9/28/2001 12:00:00 AM | P | CANC |
|
|
Not fire insp 9/28/2001 1:11:40 PM
|
FIR01-00387
| INSP-Final Inspection | 9/27/2001 | 9/28/2001 | 9/27/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 11:17:46. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/27/2001 at 11:21:02.
|