Inspections for the day of: Friday, September 28, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01287 BLD-Aging Inspection9/28/20019/28/20019/28/2001 12:00:00 AM PART
wip inspections done under bld00-02813 10/2/2001 11:59:37 AM
BLD01-01507 BLD-Aging Inspection9/28/20019/28/20019/28/2001 12:00:00 AM PART
wip. 10/5/2001 11:55:16 AM
BLD00-01470 BLD-Final9/26/20019/28/20019/28/2001 12:00:00 AMAFAIL
arron ###-#### fn . needs landing and smoke detectors also mec could be finaled at next inspection. appears to be duct work only. 9/28/2001 9:58:52 AM
BLD00-00648 BLD-Final9/27/20019/28/20019/28/2001 12:00:00 AMAPASS
appears to be gone. 9/28/2001 1:24:25 PM
BLD01-02418 BLD-Framing/Rough-in9/27/20019/28/20019/28/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/27/2001 at 12:59:21. Contact: ###-####. The fiber glass columns have no attachment details shown on the approved plans, for the uplift connections of top and bottom support and bearing points, of(3) 11-7/8 mico lams and concrete footings, c/n to provide connection details from the column manfacturer. 9/28/2001 11:23:46 AM
BLD01-02626 BLD-Footing9/27/20019/28/20019/28/2001 12:00:00 AMANR
###-#### KIM .No plans or boards up yet. 9/28/2001 11:30:50 AM
BLD01-02461 BLD-Final9/27/20019/28/20019/28/2001 12:00:00 AMAFAIL
fn ??sue ###-#### . need to clarify the attachement of the (5) fixed shelves to the concrete,appears to call out 5/16 bolts now has 1/4 bolts which are attached 9/28/2001 12:51:50 PM to to bottom cross rail not the end column. also needs fire/life safety c/n posted. 9/28/2001 12:52:34 PM
BLD00-03081 BLD-Final9/27/20019/28/20019/28/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/27/2001 at 16:56:08. Contact: ###-####. needs ele. 9/28/2001 1:17:21 PM
BLD01-01172 BLD-Framing/Rough-in9/28/20019/28/20019/28/2001 12:00:00 AMPCANC
partial on 3rd flr ###-####
BLD00-02815 BLD-Final9/28/20019/28/20019/28/2001 12:00:00 AMPPART
fn ###-####- john fn c/n posted ok for a temp oc. 9/28/2001 4:03:53 PM
BLD01-01288 BLD-Final9/28/20019/28/20019/28/2001 12:00:00 AMPPART
fn ###-####- john fn. needs a plumbing permit because a area separation wall was required after the permit was issued. 9/28/2001 4:05:16 PM
BLD00-03593 BLD-Final9/28/20019/28/20019/28/2001 12:00:00 AMPNR
Cathy has the card - if there are any questions call Chris @ ###-#### Appears to need s-i reports. 9/28/2001 3:58:47 PM
BLD01-02461 BLD-Final9/28/20019/28/20019/28/2001 12:00:00 AMPFAIL
Scheduled by Inspector: 407 On 9/28/2001 2:02:52 PM . Recieved call back from plan reveiw, that i made while at the site, All Racking was to be bolted to floor, As engineer had told plan revew, these were stationary not rolling racking, these racks do roll as decribed by the floor plan. There is no means over providing over turn protection to these racks, I have called the architect and left a voice message to retun my call , John Maning at ###-####. This correction of bolting with 5/16 in bolts applys to all racks. No just the stationary racks c/n for all racks. 9/28/2001 2:18:08 PM