Inspections for the day of: Friday, September 28, 2007.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00811 INSP-Final Inspection9/28/20079/28/200710/1/2007 1:36:30 PMPFAIL
See Ken's field notes on the city approved plans for the items tested.
FIR07-00642 INSP-Sprinkler Rough-in9/27/20079/28/20079/28/2007 3:47:47 PMPPASS
See the city approved plans for areas marked with todays date that are ok for cover.
FIR07-00735 INSP-Sprinkler Rough-in/Hydro9/27/20079/28/20079/28/2007 3:38:49 PMPPASS
24 hour air test passed
FIR05-00536 INSP-Sprinkler Rough-in9/28/20079/28/20079/28/2007 2:00:44 PMPPASS
The two sprinkler heads and related sprinkler piping located above the "rulon" ceiling on the 9th floor.
FIR07-00762 INSP-Final Inspection9/27/20079/28/20079/28/2007 1:49:02 PMAPASS
Permit finaled
BLD07-01468 FIRE-Final Inspection9/27/20079/28/20079/28/2007 1:47:49 PMPPASS
Life safety passed.
BLD07-01468 FIRE-Final Inspection9/27/20079/28/20079/28/2007 11:18:59 AMAPASS
Life safety passed.
BLD07-02314 FIRE-Final Inspection9/28/20079/28/20079/28/2007 10:44:10 AMAPASS
Life safety passed.
BLD07-01849 FIRE-Final Inspection9/27/20079/28/20079/28/2007 10:15:04 AMAPASS
Life safety passed.
FIR06-00988 INSP-Supply line flush9/27/20079/28/20079/28/2007 10:06:21 AMAPASS
The underground supply line flush for the building is passed. I also gave a rough-in inspection for the overhead piping that Forrest had not looked at. This piping is ok.
FIR07-00779 INSP-Sprinkler Rough-in9/27/20079/28/20079/28/2007 9:01:01 AMAPASS
All of the sprinkler piping except in the file/storage room is ok to cover.
BLD07-01848 FIRE-Final Inspection9/27/20079/28/20079/27/2007 2:06:21 PMAPASS
Life safety passed.