FIR06-00811
| INSP-Final Inspection | 9/28/2007 | 9/28/2007 | 10/1/2007 1:36:30 PM | P | FAIL |
|
|
See Ken's field notes on the city approved plans for the items tested.
|
FIR07-00642
| INSP-Sprinkler Rough-in | 9/27/2007 | 9/28/2007 | 9/28/2007 3:47:47 PM | P | PASS |
|
|
See the city approved plans for areas marked with todays date that are ok for cover.
|
FIR07-00735
| INSP-Sprinkler Rough-in/Hydro | 9/27/2007 | 9/28/2007 | 9/28/2007 3:38:49 PM | P | PASS |
|
|
24 hour air test passed
|
FIR05-00536
| INSP-Sprinkler Rough-in | 9/28/2007 | 9/28/2007 | 9/28/2007 2:00:44 PM | P | PASS |
|
|
The two sprinkler heads and related sprinkler piping located above the "rulon" ceiling on the 9th floor.
|
FIR07-00762
| INSP-Final Inspection | 9/27/2007 | 9/28/2007 | 9/28/2007 1:49:02 PM | A | PASS |
|
|
Permit finaled
|
BLD07-01468
| FIRE-Final Inspection | 9/27/2007 | 9/28/2007 | 9/28/2007 1:47:49 PM | P | PASS |
|
|
Life safety passed.
|
BLD07-01468
| FIRE-Final Inspection | 9/27/2007 | 9/28/2007 | 9/28/2007 11:18:59 AM | A | PASS |
|
|
Life safety passed.
|
BLD07-02314
| FIRE-Final Inspection | 9/28/2007 | 9/28/2007 | 9/28/2007 10:44:10 AM | A | PASS |
|
|
Life safety passed.
|
BLD07-01849
| FIRE-Final Inspection | 9/27/2007 | 9/28/2007 | 9/28/2007 10:15:04 AM | A | PASS |
|
|
Life safety passed.
|
FIR06-00988
| INSP-Supply line flush | 9/27/2007 | 9/28/2007 | 9/28/2007 10:06:21 AM | A | PASS |
|
|
The underground supply line flush for the building is passed. I also gave a rough-in inspection for the overhead piping that Forrest had not looked at. This piping is ok.
|
FIR07-00779
| INSP-Sprinkler Rough-in | 9/27/2007 | 9/28/2007 | 9/28/2007 9:01:01 AM | A | PASS |
|
|
All of the sprinkler piping except in the file/storage room is ok to cover.
|
BLD07-01848
| FIRE-Final Inspection | 9/27/2007 | 9/28/2007 | 9/27/2007 2:06:21 PM | A | PASS |
|
|
Life safety passed.
|