FIR11-00096
| FIR-Aging Inspection | 9/28/2012 | 9/28/2012 | 10/1/2012 9:31:46 AM | | NR |
|
|
Forwarded information to Scott for further action.
|
FIR10-00429
| FIR-Aging Inspection | 9/28/2012 | 9/28/2012 | 10/1/2012 9:31:24 AM | | NR |
|
|
Forwarded information to Scott for further action.
|
BLD12-02542
| FIRE-Conference | 9/28/2012 | 9/28/2012 | 9/28/2012 3:50:39 PM | P | DONE |
|
|
I met Petra and the building owner and discussed hardware options on the south/rear exit door.
|
FIR12-00395
| INSP-Sprinkler Rough-in | 9/28/2012 | 9/28/2012 | 9/28/2012 3:24:08 PM | P | PASS |
|
|
Building 11, first and second floor rough-in passed and piping can be covered. Third floor can not be covered until the tenting has been modified. Areas that can not be covered are where the heat tape and associated wiring/control is located when it is installed.
|
BLD11-00317
| FIRE-Final Inspection | 9/24/2012 | 9/28/2012 | 9/28/2012 3:22:00 PM | P | FAIL |
|
|
Provide the annual inspection for the fire sprinkler system, provide single action hardware on the exit doors and intenal pass through door, repair the emergency lighting (old emergency lighting can be removed as discussed), provide sprinkler protection in the west corridor. Sprinkler pendant is located too close to wall in west restroom. Pendants appear overspaced above east cash register.
|
BLD12-01863
| FIRE-Final Inspection | 9/26/2012 | 9/28/2012 | 9/28/2012 12:33:03 PM | A | PASS |
|
|
Life safety passed
|
FIR12-00459
| INSP-Final Inspection | 9/27/2012 | 9/28/2012 | 9/28/2012 11:26:07 AM | A | PASS |
|
|
permit finaled
|
FIR12-00177
| FIR-Aging Inspection | 9/28/2012 | 9/28/2012 | 9/28/2012 9:30:03 AM | | NR |
|
|
Per Clint the project is currently suspended but might possibly start back up.
|