Inspections for the day of: Wednesday, September 28, 2016.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE15-01348 Final9/28/20169/28/20169/29/2016 8:13:25 AMPFAIL
Level 5 and Level 6 C/S Power and Lighting Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- furniture connections shall be installed as per manufacturers instructions. 51C-28 open neutral.
300.15- All boxes containing cables and wiring shall have covers installed.
300.21- Fire wall penetrations shall be sealed.
392.60- ladder racks and cable tray bonding shall be complete.
605.5- Furniture connections and installation shall be complete.
All stack 1 lab to remain unfinished until after 10-7-16.
All panic hardware installed for annex to be energized.
Basement electrical room that has gen set in to retest breakers due to flood.
ELE16-01838 Final9/28/20169/28/20169/29/2016 8:08:18 AMPFAIL
Level 5 and Level 6 TI Power and Lighting Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- furniture connections shall be installed as per manufacturers instructions. 51C-28 open neutral.
300.15- All boxes containing cables and wiring shall have covers installed.
300.21- Fire wall penetrations shall be sealed.
392.60- ladder racks and cable tray bonding shall be complete.
605.5- Furniture connections and installation shall be complete.
All hand dryer lock outs installed
ELE16-00151 Electrical Rough-In9/27/20169/28/20169/28/2016 5:25:11 PMPPASS
TCO walk for VRT level.
Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
Ramp lights (6) trims on back order with no exposed wiring. caulking when complete.
Verify fusing on 480 v AC units.
Temp occupy ok. Signed core and shell sheet for TRV TI only place to sign.
ELE13-01291 Electrical Rough-In9/28/20169/28/20169/28/2016 4:32:30 PMPPASS
underground between HQ building and Annex building. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
South side of HQ and east 1/2 off annex underground rough in ok cover.
ELE16-01652 Electrical Rough-In9/27/20169/28/20169/28/2016 11:57:17 AMPPASS
Fountain rebar bonding and lighting piping. will be ready early pm Thanks John Phone #: ###-#### Inspection requested via web by John Rourke
Areas noted rough in ok cover
ELE16-00151 Electrical Rough-In9/27/20169/28/20169/28/2016 11:36:37 AMAPART
TCO walk for VRT level to reinspect previous items. Later in the morning if possible.
Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
Items still needed.
300.15- Junction box covers shall be installed, southend ceiling, north electrical rm. Ramp lights on wall 6 are back ordered, boxes open with no exposed wiring. Shall caulk and seal from moisture.
Lamps required in bathrooms back in stool areas very dark.
440.4- Fusing for AC unit still need 480 volt units fused correctly.
ELE16-00442 Electrical Rough-In9/28/20169/28/20169/28/2016 10:19:57 AMPPASS
Jake would like AM if possible Phone #: ###-####
Level 4 unit 425 to east receptacle additions rough in ok cover
ELE16-02722 Final9/28/20169/28/20169/28/2016 9:41:08 AMAPASS
if side door is closed the front door is open Phone #: ###-#### Inspection requested via web by steve sellers
No card posted. Final ok
ELE16-03135 Final9/27/20169/28/20169/28/2016 6:17:04 AMACANC
Concrete electrode Phone #: ###-#### >> Inspection requested via web by Kyle Lott Inspection cancelled from web by: Kyle Lott