ESC15-00762
| General Inspection | 9/28/2016 | 9/28/2016 | 9/29/2016 3:00:08 PM | | CANC |
|
|
|
ESC16-00224
| Aging Inspection | 9/28/2016 | 9/28/2016 | 9/29/2016 10:00:06 AM | | PASS |
|
|
WIP on remodel. No trackout, work area retains runoff. No spills or uncontained trash.
|
ESC16-00315
| General Inspection | 9/28/2016 | 9/28/2016 | 9/29/2016 9:58:16 AM | P | PART |
|
|
Permit sign now posted in front window. NO trackout or debris leaving site. Need to remove stockpile and landscape. No mud/debris on sidewalk
Called RP and GC to remind them of ESC permit conditions
|
ESC15-01368
| Aging Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 2:49:07 PM | | CANC |
|
|
|
ESC15-00556
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 2:41:08 PM | | PASS |
|
|
WIP on subdivsion. Currently crews installing walking path and playground up against foothills. No trackout outside of sub, no fugitive dust observed during construction or reported.
WIP on road work on HV Road, checking with ACHD on status of east side of road that has been damaged and patched. Response pending
|
ESC15-00976
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 2:17:43 PM | | CANC |
|
|
|
ESC16-01342
| Site Preparation | 9/27/2016 | 9/28/2016 | 9/28/2016 2:16:44 PM | P | PASS |
|
|
Joe Phone #: ###-####
Downslope perimeter silt fence is installed and trenched properly. Construction access is off Warm Springs and permit sig is posted. Upper parcel is bermed and has pit run covering. OK to hold on construction rock unless track out becomes issue.
Excavation to begin on Monday. Water truck needs to be onsite for dust control. Will check in next week.
Approved for construction.
|
ESC15-01161
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 12:25:33 PM | | CANC |
|
|
rescheduled 9/29
|
ESC15-00957
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 12:13:39 PM | | CANC |
|
|
rescheduled 9/29
|
ESC16-00168
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 12:11:17 PM | | CANC |
|
|
|
ESC15-00871
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 12:09:47 PM | | PART |
|
|
Preece Street is clean, sediment bag installed. RP Chad onsite. Canal bank is stabile and vegetated with volunteer plants, no work or stockpiling in area.
RP stated site trash containers are being hauled offsite. Requested that onsite infiltration swale have sediment protection at inlet to prevent from clogging. Further work and grooming is required on installation, but RP stated he will install a sediment barrier and clean around inlet area.
|
ESC16-00401
| Aging Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 11:40:38 AM | | PEND |
|
|
No activity. NO earth disturbance. No activity on BLD permit, near expiration. Will keep open in case building begins..
|
ESC16-00722
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 11:00:53 AM | A | PART |
|
|
Permit sign posted, construction entrance installed. No significant trackout, no discharges. Water truck on site but not in use at time of inspection and during surveillance.
Verbal correction request to onsite supervisor to run water truck over haul road and to hit stockpile. Driver started water truck while on site. Requested one - two loops per hours and to hit stockpiles.
Notified RP to do maintenance on DI bag.
|
ESC04-01566
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:40:53 AM | P | PASS |
|
|
old expired permit in system. no inspection
|
ESC03-01084
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:40:46 AM | P | PASS |
|
|
old expired permit in system. no inspection
|
ESC04-00412
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:40:37 AM | P | PASS |
|
|
old expired permit in system. no inspection
|
ESC15-01200
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:40:12 AM | P | PASS |
|
|
Cordillera # 2 unit complete, landscaped, and approved for occupancy. No further ESC requests, see also ESC15-00336
|
ESC15-01201
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:40:02 AM | P | PASS |
|
|
Cordillera # 2 unit complete, landscaped, and approved for occupancy. No further ESC requests, see also ESC15-00336
|
ESC15-01202
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:39:54 AM | P | PASS |
|
|
Cordillera # 2 unit complete, landscaped, and approved for occupancy. No further ESC requests, see also ESC15-00336
|
ESC15-01199
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:39:47 AM | P | PASS |
|
|
Cordillera # 2 unit complete, landscaped, and approved for occupancy. No further ESC requests, see also ESC15-00336
|
ESC15-01203
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:39:37 AM | P | PASS |
|
|
Cordillera # 2 unit complete, landscaped, and approved for occupancy. No further ESC requests, see also ESC15-00336
|
ESC15-01199
| Aging Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 10:37:22 AM | | PASS |
|
|
Cordillera 4-plex complete, landscaped, and occupied. No further ESC requests.
|
ESC15-00336
| Site Final | 9/28/2016 | 9/28/2016 | 9/28/2016 10:35:35 AM | P | PASS |
|
|
Cordillera #2 subdivison and 6-plex construction is complete. Landscaping and irrigation installed. No remaining temp BMPs in municipal storm drain.
Private storm drains within site and final sweeping of landscaping gravel to be completed by the apartment management company. Units now occupied. No construction materials or stockpiles on site.
All permits finaled.
|
ESC15-01127
| Aging Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 10:35:20 AM | | PASS |
|
|
Cordillera #2 subdivison and 6-plex construction is complete. Landscaping and irrigation installed. No remaining temp BMPs in municipal storm drain.
Private storm drains within site and final sweeping of landscaping gravel to be completed by the apartment management company. Units now occupied. No construction materials or stockpiles on site.
All permits finaled.
|
ESC15-01127
| DOC - Permit Finaled | 9/28/2016 | 9/28/2016 | 9/28/2016 10:31:46 AM | P | PASS |
|
|
|
ESC16-01200
| Site Preparation | 9/27/2016 | 9/28/2016 | 9/28/2016 10:00:40 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
Subdivision BMPs installed. Street sweeper coming at end of week due to heavy activity. Approved for construction
|
ESC16-01270
| Site Preparation | 9/27/2016 | 9/28/2016 | 9/28/2016 10:00:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
Subdivision BMPs installed. Street sweeper coming at end of week due to heavy activity. Approved for construction
|
ESC16-01177
| Site Preparation | 9/27/2016 | 9/28/2016 | 9/28/2016 10:00:03 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
Subdivision BMPs installed. Street sweeper coming at end of week due to heavy activity. Approved for construction
|
ESC15-00817
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 9:19:53 AM | | PASS |
|
|
|
ESC15-01184
| General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 8:51:26 AM | | PASS |
|
|
Vertical construction in progress. All MS4 inlets around site are fitted with sediment filter bags. 2 x construction entrance. No trash, trackout, or discharges occuring
|