ELE18-03592
| Conference | 9/27/2018 | 9/28/2018 | 9/28/2018 2:48:00 PM | P | PASS |
|
|
Please call Kaden at ###-#### 15-20min before arriving in order to meet at job location. Phone #: ###-#### Inspection requested via web by William Salts Discussed options for service change with 200 amp for house and 200 for future additions. A single conduit has been installed to house from ground box provided by Idaho Power. Contractor to look at possible service on rack at ground box and subfeed gutter on house if conduit fill will allow. Confirmed all subfeeds on load side of service will reastablish ground at each seperate structure. Confirmed available grounding electrodes shall be used. Existing service on house has #6 from meter to 100 amp disconnect and 3 conductors feeding sub panel in house.
|
ELE18-03310
| Electrical Rough-In | 9/28/2018 | 9/28/2018 | 9/28/2018 1:56:19 PM | P | PASS |
|
|
grid ceiling, Call 1hr before to coordinate access Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Grid for areas previously noted rough in ok cover
|
ELE18-03320
| Electrical Rough-In | 9/27/2018 | 9/28/2018 | 9/28/2018 12:41:18 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton BCC BCC Section 4-05-23 UNLAWFUL TO CONCEAL It shall be unlawful for any person, to cover up or in any way conceal any electrical wiring, cables, conduits or other equipment until the same has been inspected and approved by an Electrical Inspector. (6338, Added, 08/03/2004) Remove insulation in north and west walls South and east and bay window exterior walls only ok cover
|
ELE18-02489
| Permanent Service | 9/27/2018 | 9/28/2018 | 9/28/2018 12:29:41 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton p/s u/g n ok
|
ELE18-01680
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 11:26:29 AM | A | PASS |
|
|
Contact is Derek Ball Phone #: ###-#### Inspection requested via web by Scott Campbell Final ok
|
ELE18-03698
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 11:25:05 AM | A | PASS |
|
|
Warren Phone #: ###-#### Final ok
|
ELE18-03476
| Electrical Rough-In | 9/27/2018 | 9/28/2018 | 9/28/2018 10:55:57 AM | A | PASS |
|
|
underground // Zack Phone #: ###-#### Discussed issue of more than 360 degrees of bends in underground feeds for east main electrical room. 1 turning up in east electrical room, 1 turning west mid point, than noticed trench has 2 offsets around drainage. At this point a total of 360 degrees will be in conduit run. Zack has presented issue to general contractor and waiting for responce. East electrical room underground rough in ok cover.
|
ELE18-03383
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 10:21:06 AM | A | PASS |
|
|
This Will Be Open And Ready For Final Call With Any Questions Thank You So Much Phone #: ###-#### Inspection requested via web by jason shifflett Final ok
|
ELE18-02563
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 9:59:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Burke Final ok
|
ELE18-02896
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 9:29:32 AM | A | FAIL |
|
|
Plans have been left on site in the meter box Phone #: ###-#### Inspection requested via web by Ashley White 310.15(B)(7)(2)- For feeders supplying entire load associated with a single family dwelling they shall be permitted to have an ampacity not less than 83% of service rating. 200X83%= 166 amps. 75 degree column 2/0 minimum required 1/0 installed. 358.42 EMT connectors shall be made tight. * Plans shall be provided as stated in notes. None on site.
|
ELE18-03707
| Electrical Rough-In | 9/27/2018 | 9/28/2018 | 9/28/2018 8:51:15 AM | A | PASS |
|
|
David ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Kitchen family remodel rough in ok cover
|