Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-03073 Electrical Rough-In9/28/20189/28/20189/28/2018 1:53:52 PMPPASS
Rough in inspection for basement edition. Ree wire out of the garage. Re-wire of up stairs area. Phone #: ###-#### Inspection requested via web by Garrett Collins Ok cover basement. Will check main level recepts on final.
ELE18-03010 Final9/28/20189/28/20189/28/2018 1:29:49 PMPPASS
a re-scheduled final for solar install

The gate will be open and held ajar; and no dogs!!

The customer will be in and out all day, but knows you might be there today.

Approved plans on site, and give me a call at ###-#### if ya need anything at all.

Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Ok final. All labels present, brkrs and wire size accordingly.
ELE18-03727 Conference9/27/20189/28/20189/28/2018 1:05:18 PMPPASS
Would like to do this Friday am sometime. Preferably before 12:00. Thanks Phone #: ###-#### Inspection requested via web by Shane Cobb Work already done. All work looks good. Correct brkr size, fuse size and wire. Convienece outlet within range.
ELE18-03727 Final9/28/20189/28/20189/28/2018 1:04:05 PMPPASS
Ok final. All wire size, fuses and brkr size correct.
ELE18-02944 Final9/27/20189/28/20189/28/2018 12:46:30 PMAPASS
call Ryan Parker to unlock house Phone #: ###-#### Ok final.
ELE18-03722 Electrical Rough-In9/27/20189/28/20189/28/2018 12:45:58 PMAPASS
Rough in inspection any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Ok cover kitchen.
ELE18-03720 Final9/27/20189/28/20189/28/2018 12:24:56 PMPPASS
Replace broken class 6 pole. repair conduit. Phone #: ###-#### Inspection requested via web by Steve Blackmer New pole installed for existing service. Ok final. 2 grd rods.
ELE18-03720 Permanent Service9/28/20189/28/20189/28/2018 12:24:16 PMPPASS
2 grd rods. p/s o/h rec ok
ELE18-03206 Final9/27/20189/28/20189/28/2018 10:15:51 AMAPASS
Phone #: ###-#### Inspection requested via web by Mike R. Rossknecht Ok final. Talked to contractor. 1 spark ring needed in front office with corner window. He was headed there today, and will notify me when completed
ELE18-03206 Electrical Rough-In9/27/20189/28/20189/28/2018 10:14:59 AMAPASS
For ceiling work. Phone #: ###-#### Inspection requested via web by Mike R. Rossknecht Ok cover.
ELE18-03702 Final9/27/20189/28/20189/28/2018 10:14:21 AMAPASS
Call Jay @ ###-#### Phone #: ###-#### Inspection requested via web by Seth Stears Ok final. Talked to contractor about city ordinance requireing RI inspection prior to install. All solar edge components used. Labeling, brkr size and wire size correct. RI will be scheduled for future installations.
ELE18-01860 Electrical Rough-In9/27/20189/28/20189/28/2018 9:11:30 AMAPASS
Floor heat master bath garage code is JAYO enter Phone #: ###-#### Inspection requested via web by Zane Robertson Ok cover mstr floor heat.
ELE18-03713 Electrical Rough-In9/27/20189/28/20189/28/2018 8:45:20 AMAPASS
Phone #: ###-#### Inspection requested via web by steve sellers Ok cover kitchen. New main brkr panel on back of house, grds and neut bonded. Meter is on pole