PLM95-00663
| INSP - Framing/ Rough-in | 9/29/1995 | 9/29/1995 | 9/29/1995 12:00:00 AM | | PASS |
|
|
/ / 330 -
|
PLM95-00878
| INSP - Framing/ Rough-in | 9/29/1995 | 9/29/1995 | 9/29/1995 12:00:00 AM | | PASS |
|
|
/ / 330 - 2-WC,3-LAV,2-TUB,1-SI,1-WB,1-WH
|
PLM95-01149
| INSP - Sewer line | 9/29/1995 | 9/29/1995 | 9/29/1995 12:00:00 AM | | PASS |
|
|
/ / 330 -
|
PLM95-01132
| INSP - Sewer and Water lines | 9/28/1995 | 9/29/1995 | 9/29/1995 12:00:00 AM | A | PASS |
|
|
09/28/95 330 -
|