Inspections for the day of: Wednesday, September 29, 1999.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02741 BLD-Foundation9/28/19999/29/19999/29/1999 12:00:00 AMPPASS
JERRY ###-#### FOUND-
BLD98-03533 BLD-Final9/28/19999/29/19999/29/1999 12:00:00 AMPPASS
DON ###-#### C/C #16250
BLD99-01703 BLD-Framing/Rough-in9/28/19999/29/19999/29/1999 12:00:00 AMPFAIL
DON ###-#### C/N.. Truss corr.
BLD99-02346 BLD-Framing/Rough-in9/28/19999/29/19999/29/1999 12:00:00 AMPFAIL
Troy ###-#### C/N.. Complete per. Corr. And interior shear panels
BLD99-01839 BLD-Framing/Rough-in9/28/19999/29/19999/29/1999 12:00:00 AMPFAIL
LARRY ###-#### FR INSP C/N.. Add interior shear panels
BLD99-02433 BLD-Framing/Rough-in9/29/19999/29/19999/29/1999 12:00:00 AMPPART
SHEAR NAILING JOHN ###-#### Shear wall ok
BLD99-02546 BLD-Framing/Rough-in9/29/19999/29/19999/29/1999 12:00:00 AMPFAIL
MIKE ###-#### C/N.. Nail hanger, brace gable, block trusses
BLD99-02235 BLD-Framing/Rough-in9/29/19999/29/19999/29/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/29/1999 at 09:08:45. Contact: ###-####. C/N truss corrections
BLD99-01535 BLD-Energy code compliance9/29/19999/29/19999/29/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/29/1999 at 09:09:20. Contact: .
BLD99-02143 BLD-Framing/Rough-in9/29/19999/29/19999/29/1999 12:00:00 AMPPASS
burt ###-####
BLD99-02143 BLD-Energy code compliance9/29/19999/29/19999/29/1999 12:00:00 AMPPASS
BLD99-01535 BLD-Framing/Rough-in9/29/19999/29/19999/29/1999 12:00:00 AMPPASS