Inspections for the day of: Wednesday, September 29, 1999.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM99-03291 Plumbing Rough-in9/28/19999/29/19999/29/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/28/1999 at 12:45:41. Contact: ###-####. R/I ok
PLM99-03307 Water and/or Sewer9/28/19999/29/19999/29/1999 12:00:00 AMAPASS
###-#### - SWR & WATER S/W final ok
PLM99-03317 Water and/or Sewer9/28/19999/29/19999/29/1999 12:00:00 AMAPASS
TINA-- ###-#### SWR & WATER S/W final ok
PLM99-03319 Water and/or Sewer9/28/19999/29/19999/29/1999 12:00:00 AMAPASS
tina ###-#### swr & water S/W final ok
PLM99-03318 Water and/or Sewer9/28/19999/29/19999/29/1999 12:00:00 AMAPASS
tina ###-#### swr & water S/W final ok
PLM99-02689 Plumbing Rough-in9/29/19999/29/19999/29/1999 12:00:00 AMAPART
Med gas fittings ok
PLM99-03233 Plumbing Rough-in9/29/19999/29/19999/29/1999 12:00:00 AMAPART
S.S. md water services not installed and covered as reported
PLM98-00259 Final9/29/19999/29/19999/29/1999 12:00:00 AMAFAIL
Set kitchen sink
BLD99-01014 BLD-Final9/29/19999/29/19999/29/1999 12:00:00 AMPFAIL
Dbl. fee, plumbing work done without a permit or inspection.
BLD99-01015 BLD-Final9/29/19999/29/19999/29/1999 12:00:00 AMPFAIL
Dbl. fee, plumbing work done without a permit or inspection. 10/1/99-no plumbing per 330 lh
PLM99-03321 Plumbing Rough-in9/29/19999/29/19999/29/1999 12:00:00 AMPPASS
CRAIG ###-#### R/I R/I ok
PLM99-02765 Final9/29/19999/29/19999/29/1999 12:00:00 AMPPASS
DALE ###-#### 3rd floor final ok
PLM99-03326 Final9/29/19999/29/19999/29/1999 12:00:00 AMPPASS
###-####-KEITH FOR SWR & WATER S/W final ok
PLM99-03327 Water and/or Sewer9/29/19999/29/19999/29/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/29/1999 at 10:54:01. Contact: ###-####. S/W, storm drains, grease interceptor final ok
PLM99-03312 Final9/29/19999/29/19999/29/1999 12:00:00 AMPFAIL
TANYA ###-#### Set all equipment, DCUA on premis, R.P. on espresso verify ice maker air gap, expantion tank
PLM99-03303 Sprinkler (Final)9/29/19999/29/19999/29/1999 12:00:00 AMPPASS
KELLY ###-#### Sprinkler final ok