Inspections for the day of: Friday, September 29, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Ray
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-03511 Electrical Rough-In9/28/20009/29/20009/29/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/28/2000 at 14:44:41. Contact: ###-####. Only ceiling before sheetrock. bathroom ceilings ok for cover 9/29/2000 8:24:11 AM
ELE00-03806 Electrical Rough-In9/28/20009/29/20009/29/2000 12:00:00 AMAPASS
John ###-####
ELE00-03808 Rough-In Permanent Service9/28/20009/29/20009/29/2000 12:00:00 AMAFAIL
CLYDE ###-#### R/I & SER no windows called contr 9/29/2000 9:42:23 AM
ELE00-03811 Final9/28/20009/29/20009/29/2000 12:00:00 AMAPASS
###-#### hot tub
ELE00-03101 Final9/29/20009/29/20009/29/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/29/2000 at 06:59:51. Contact: ###-####.
ELE00-00012 Final9/29/20009/29/20009/29/2000 12:00:00 AMPPASS
###-#### gary fn
ELE00-00377 Final9/29/20009/29/20009/29/2000 12:00:00 AMPPASS
gary ###-#### fn
ELE00-03687 Electrical Rough-In9/29/20009/29/20009/29/2000 12:00:00 AMPPASS
###-#### cover inspection for the floor
ELE00-02594 Final9/29/20009/29/20009/29/2000 12:00:00 AMPPASS
###-####