ELE06-02458
| ELE-Aging Inspection | 9/29/2006 | 9/29/2006 | 10/2/2006 1:37:46 PM | | CANC |
|
|
|
ELE06-03551
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 4:02:13 PM | P | FAIL |
|
|
Jason; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt called not ready for final needs r/i shall remove all devices, and remove sheet rock patches so I can inspect, and wire kitchen to current code requirements
|
ELE06-03185
| Electrical Rough-In | 9/29/2006 | 9/29/2006 | 9/29/2006 3:36:33 PM | P | PART |
|
|
need rough in on new building. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH corr. posted for damaged wiring done by concrete contr, shall repair or turn off power, called contr . will address problem, r/i for ceilings ok
|
ELE06-02216
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 3:03:29 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/29/2006 at 7:40:39 AM. Contact: ###-####. ok
|
ELE06-03622
| Temporary Service | 9/29/2006 | 9/29/2006 | 9/29/2006 1:39:55 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: TJ Sturges t/s o/h new ok
|
ELE06-03616
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 1:39:36 PM | P | PASS |
|
|
DAVE BRADSHAW - CALL & HE WILL MEET @ JOBSITE; Phone #: ###-#### Internet Inspection Request from: Randy Vail
|
ELE06-03568
| Electrical Rough-In | 9/28/2006 | 9/29/2006 | 9/29/2006 11:52:23 AM | A | PASS |
|
|
Electrician will not be there -- homeowner will be home. Any questions, you will have to contact the shop. Thank you.; Phone #: ###-#### Internet Inspection Request from: Tawnya McKinney ok survey posted called box fill and remove e strip from cutin box left of range
|
ELE06-03503
| Rough-In Permanent Service | 9/27/2006 | 9/29/2006 | 9/29/2006 10:58:45 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 9/27/2006 at 3:58:09 PM. Contact: ###-####. corr. called 300.4(A)(1)&(D) nail plates and 11/4" parallel to studs, u/g for post light covered before inspection
|
ELE06-03504
| Rough-In Permanent Service | 9/27/2006 | 9/29/2006 | 9/29/2006 10:56:27 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 9/27/2006 at 3:56:43 PM. Contact: ###-####. corr. called 300.4(A)(1) nail plates ,110.14(A) lug at bond bushing loose, u/g for post light covered before inspection
|
ELE06-02364
| Electrical Rough-In | 9/28/2006 | 9/29/2006 | 9/29/2006 9:56:53 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/28/2006 at 5:14:26 PM. Contact: ###-####. west end exercise and spinning rms, common wall, east end exercise and corridor walls ok
|
ELE06-02426
| Electrical Rough-In | 9/28/2006 | 9/29/2006 | 9/29/2006 9:25:33 AM | A | FAIL |
|
|
Reinspect trench; Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot u/g shall be 24" in parking lot, also need to know what grade is called told contr,
|
ELE05-04208
| ELE-Aging Inspection | 9/29/2006 | 9/29/2006 | 9/29/2006 7:15:29 AM | | CANC |
|
|
|
ELE05-04093
| ELE-Aging Inspection | 9/29/2006 | 9/29/2006 | 9/29/2006 7:15:13 AM | | PART |
|
|
r/i ok
|
ELE06-01560
| Electrical Rough-In | 9/28/2006 | 9/29/2006 | 9/29/2006 12:00:00 AM | P | CANC |
|
|
jeff ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley per Jim S. this permit needs to be voided see comments///dld
|