MEC06-03178
| Conference | 9/27/2006 | 9/29/2006 | 10/2/2006 11:40:38 AM | A | PASS |
|
|
meet Dixie and Jason on job site ###-#### 10:30am met with dix and the plumber about redesigned geo piping.
|
MEC06-02012
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 5:08:31 PM | P | FAIL |
|
|
House is open; Phone #: ###-#### Internet Inspection Request from: Wade Huskey. provide unions at the boiler. pipe makeup water r.p. to hub drain. provide boiler installation instructions to verify venting requirements. seal all joints in the range exhaust ducting. 1st floor den fireplace flue is incomplete. dryer vent in garage is broken at wall. need access to west end crawlspace to inspect ductwork.
|
MEC05-02759
| Final | 9/28/2006 | 9/29/2006 | 9/29/2006 5:04:34 PM | P | FAIL |
|
|
shelley ###-#### 1st floor den fireplace flue is incomplete.
|
MEC06-03216
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 4:25:47 PM | P | NR |
|
|
Pressure test line. Please inspect as early as possible. Call with any questions.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS need to set reg prior to final.
|
MEC06-03216
| Pressure Test | 9/29/2006 | 9/29/2006 | 9/29/2006 4:25:20 PM | P | PASS |
|
|
Pressure test line. Please inspect as early as possible. Call with any questions.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS 60# test ok, needs to set reg prior to final.
|
MEC06-02369
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 4:02:51 PM | P | PASS |
|
|
david; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
MEC06-03112
| Rough-in | 9/29/2006 | 9/29/2006 | 9/29/2006 3:48:09 PM | P | PASS |
|
|
DON
|
MEC06-03177
| Final | 9/26/2006 | 9/29/2006 | 9/29/2006 3:19:10 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: loretta barck
|
MEC06-03195
| Rough-in | 9/29/2006 | 9/29/2006 | 9/29/2006 3:05:14 PM | P | PASS |
|
|
Please call Karl if you have any questions!; Phone #: ###-#### Internet Inspection Request from: Brian Donahue
|
MEC06-01229
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 2:42:08 PM | P | PASS |
|
|
Please call Kirk if problems.; Phone #: ###-#### Internet Inspection Request from: Kirk Johns
|
MEC06-03231
| Pressure Test | 9/29/2006 | 9/29/2006 | 9/29/2006 2:27:40 PM | P | PART |
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt 12 60 psi tests ok needs isolation at wall pen. and id tags.
|
PLM06-03287
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 11:22:02 AM | P | PASS |
|
|
|
MEC06-02670
| Rough-in | 9/28/2006 | 9/29/2006 | 9/29/2006 10:43:51 AM | A | FAIL |
|
|
pam; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley wrong piping on the exhaust fan.
|
MEC06-01915
| Final | 9/29/2006 | 9/29/2006 | 9/29/2006 10:20:22 AM | A | PASS |
|
|
|
MEC06-03086
| Final | 9/27/2006 | 9/29/2006 | 9/29/2006 10:18:35 AM | A | PASS |
|
|
Please inspect as early as possible. Call with any questions. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC06-03221
| Final | 9/28/2006 | 9/29/2006 | 9/29/2006 9:25:05 AM | A | NR |
|
|
PLEASE CALL KIM CHAPMAN, HOMEOWNER, AT ###-#### WHEN YOU ARE ON YOUR WAY. THANK YOU; Phone #: ###-#### Internet Inspection Request from: Andrea Creek 20# test ok , need to wrap piping and fittings below grade.
|
MEC06-03221
| Pressure Test | 9/28/2006 | 9/29/2006 | 9/29/2006 9:24:24 AM | A | PASS |
|
|
PLEASE CALL KIM CHAPMAN, HOMEOWNER, AT ###-#### WHEN YOU ARE ON YOUR WAY. THANK YOU; Phone #: ###-#### Internet Inspection Request from: Andrea Creek 20# test ok, need to wrap piping and fittings below grade.
|
MEC06-01776
| Final | 9/28/2006 | 9/29/2006 | 9/29/2006 8:57:13 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/28/2006 at 11:18:58 AM. Contact: ###-####.
|