Inspections for the day of: Friday, September 29, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD98-02583 FIRE-Final Inspection9/29/20069/29/20069/29/2006 4:46:41 PMPFAIL
Still need plans and notes
FIR06-00618 INSP-Sprinkler Rough-in/Hydro9/29/20069/29/20069/29/2006 4:46:16 PMPPASS
Underground hydro test passed.
FIR06-00616 INSP-Sprinkler Rough-in/Hydro9/29/20069/29/20069/29/2006 4:45:52 PMPPASS
Underground hydro test passed.
FIR06-00617 INSP-Sprinkler Rough-in/Hydro9/29/20069/29/20069/29/2006 3:04:25 PMPPASS
Underground hydro test passed.
FIR06-00685 INSP-Sprinkler Rough-in9/29/20069/29/20069/29/2006 2:37:07 PMPFAIL
It appears that the pendants approved to be installed are not listed for quick responce at the temperature and spacing chosen for this project. Two pendant heads have been piped off of the same outlet. The original outlet was hydraulically calculated for 30gpm but now with the two pendants it's flowing 80 gallons. Also in atleast one location the pendant heads are overspaced off of a wall. No other items have been inspected.
MIS06-00222 FIR-Final9/29/20069/29/20069/29/2006 12:20:24 PMPFAIL
I left a message on jerry's voice mail. I went to the address listed but could not determine which suite I should be looking at. No inspection performed.