Inspections for the day of: Monday, September 29, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01349 BLD-Final9/29/20089/29/20089/29/2008 4:38:33 PMPCANC
BLD08-01943 BLD-Foundation9/29/20089/29/20089/29/2008 4:32:26 PMPPART
Scheduled by a contractor via Hello! on 9/29/2008 at 11:12:55 AM. Contact: ###-####.
BLD08-01943 BLD-Wall cover9/26/20089/29/20089/29/2008 4:31:55 PMPPART
rob Phone #: ###-####
BLD07-02877 BLD-Conference9/29/20089/29/20089/29/2008 4:28:58 PMPDONE
Tony- call 30 mins prior to going Phone #: ###-####
MIS08-00135 BLD-Final9/29/20089/29/20089/29/2008 2:51:42 PMPDONE
carter--- with caldwell banker 1st before insp Phone #: ###-####
Note Right address is 2201 Coolwater C/N....GFCIs Smoke Det. Fix Garage/house separation at attic ladder.
BLD08-01841 BLD-Final9/26/20089/29/20089/29/2008 1:38:45 PMAPASS
doug Phone #: ###-####
BLD08-01841 DOC - Permit Finaled9/29/20089/29/20089/29/2008 1:38:34 PMPPASS
BLD08-01840 BLD-Final9/26/20089/29/20089/29/2008 1:38:19 PMAPASS
doug Phone #: ###-####
BLD08-01840 DOC - Permit Finaled9/29/20089/29/20089/29/2008 1:38:08 PMPPASS
BLD08-01863 BLD-Footing9/26/20089/29/20089/29/2008 1:37:55 PMAPEND
Cindy ###-####
Footing below new post and beams installed to carry ceiling joists, was never called in for inspection. Verified contractor installed 16" x 16" x 8" pier block at point load. Design specialist to verify that block is adequate to carry load.
ESC08-00766 Site Preparation9/29/20089/29/20089/29/2008 10:03:21 AMAPASS
Sign posted OK
BLD08-01943 BLD-Footing9/26/20089/29/20089/29/2008 10:02:49 AMAPASS
rob Phone #: ###-####
BLD08-01011 BLD-Framing/Rough-in9/26/20089/29/20089/29/2008 8:43:33 AMACANC
Daina- sheer Phone #: ###-####
Shear nailing OK.