MEC08-02739
| Final | 9/29/2008 | 9/29/2008 | 9/30/2008 8:33:39 AM | P | PASS |
|
|
Chad is the contact Phone #: ###-#### Internet Inspection Request from: Sheri Lilya
|
MEC08-02738
| Final | 9/29/2008 | 9/29/2008 | 9/29/2008 3:31:37 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe
|
MEC08-02713
| Conference | 9/29/2008 | 9/29/2008 | 9/29/2008 2:44:20 PM | P | PASS |
|
|
1:30 pm---need letter from engineer stating no heat exchangers or pumps to be used due to installing pvc in concrete
|
MEC08-00824
| Rough-in | 9/29/2008 | 9/29/2008 | 9/29/2008 2:42:53 PM | P | FAIL |
|
|
ethan Phone #: ###-####...need class 1 duct...dryer vent not done yet
|
ESC07-00459
| General Inspection | 9/29/2008 | 9/29/2008 | 9/29/2008 12:10:07 PM | A | PASS |
|
|
called larry with mcalvain...all DI were in place during construction..it's all been cleaned up now for final
|
MEC08-02435
| Final | 9/25/2008 | 9/29/2008 | 9/29/2008 12:04:39 PM | A | PASS |
|
|
Call Greg Shoen to meet: ###-#### Phone #: ###-#### Internet Inspection Request from: Frank Marturello....comb air ok
|
MEC07-03515
| Final | 9/26/2008 | 9/29/2008 | 9/29/2008 11:40:43 AM | A | PASS |
|
|
steve gates Phone #: ###-####--for phase 2--no card on site....called g/c nobody knew where it was
|
MEC08-02728
| Final | 9/26/2008 | 9/29/2008 | 9/29/2008 9:02:18 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica Shipley Inspection cancelled from web by: Veronica Shipley
|