Inspections for the day of: Monday, September 29, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00539 INSP - Stop Work Order9/29/20089/29/20089/29/2008 4:38:26 PMPFAIL
Permit not issued. Started to clear and grub the project area. Must call for an inspection prior to stop work order being pull and any other work except for erosion and sediment control to begin.
ESC08-00225 Random Inspection9/29/20089/29/20089/29/2008 2:58:40 PMPPASS
ESC08-00814 BMP Violation9/26/20089/29/20089/29/2008 1:59:06 PMAPASS
ESC08-00323 Site Final9/29/20089/29/20089/29/2008 1:24:16 PMPPASS
ESC08-00516 Conference9/29/20089/29/20089/29/2008 11:42:32 AMADONE
Went over the correction notice with the RP and added in a concrete washout to be install prior to next pour date.
ESC06-00446 Site Final9/29/20089/29/20089/29/2008 10:45:26 AMPPASS
Permit has expired
ESC08-00438 General Inspection9/29/20089/29/20089/29/2008 10:06:47 AM DONE
Moved to a site final.
ESC08-00438 Site Final9/29/20089/29/20089/29/2008 10:06:40 AMPPASS
ESC08-00174 Random Inspection9/29/20089/29/20089/29/2008 9:49:32 AMAPART
ESC07-01478 Random Inspection9/29/20089/29/20089/29/2008 9:45:50 AMAPASS
ESC08-00629 Random Inspection9/29/20089/29/20089/29/2008 9:41:42 AMPFAIL
Correction Notice.
1. Stabilize all slope areas. where excess dirt was pushed over the slope.
2. Maintain all bmp's with the project area.
Will re-inspect on 10/1/08 AM
ESC08-00510 General Inspection9/29/20089/29/20089/29/2008 9:39:40 AM PASS
ESC08-00490 General Inspection9/24/20089/29/20089/29/2008 8:39:00 AMAFAIL
Correction Notice.
1. Install an approved construction access at the South end of the project area.
2. Maintain the construction access at the North end of project.
Will re-inspect on 10/1/08.