FIR08-00239
| INSP-Sprinkler Rough-in | 9/22/2011 | 9/22/2011 | | P | |
|
|
lonnie Phone #: ###-####
|
FIR11-00407
| INSP-Final Inspection | 9/28/2011 | 9/29/2011 | 9/30/2011 2:33:19 PM | A | NH |
|
|
Please call me to schedule a time. Thanks! Jason Gordon ###-#### Phone #: ###-#### >> Inspection requested via web by neal Timmerman
|
FIR11-00456
| INSP-Sprinkler Rough-in | 9/28/2011 | 9/29/2011 | 9/30/2011 2:32:01 PM | P | PART |
|
|
Overhead fire sprinkler work approved for cover. Upright head separation and one missing pendent head to be verified at final.
|
BLD11-01792
| FIRE-Conference | 9/29/2011 | 9/29/2011 | 9/30/2011 2:30:08 PM | P | DONE |
|
|
On site meeting with general and subcontractor regarding existing fire sprinkler coverage above the drop ceilings at exposed combustible construction. Upright protection must meet installation guidelines per NFPA 13 2010.
|
BLD11-01791
| FIRE-Final Inspection | 9/29/2011 | 9/29/2011 | 9/29/2011 2:13:44 PM | A | NR |
|
|
Pending project related fire alarm permit work. Discussed door hardware requirements
|
FIR11-00412
| INSP-Final Inspection | 9/29/2011 | 9/29/2011 | 9/29/2011 2:12:17 PM | A | PASS |
|
|
Fire sprinkler permit work approved for final.
|
FIR11-00186
| INSP-Conference | 9/29/2011 | 9/29/2011 | 9/29/2011 2:06:47 PM | A | DONE |
|
|
Regarding plan modifications.
|
FIR11-00332
| INSP-Supply line flush | 9/28/2011 | 9/29/2011 | 9/29/2011 2:02:47 PM | A | PART |
|
|
UG fire supply line flush completed satisfactory.
|