Inspections for the day of: Thursday, September 29, 2011.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00640 Site Preparation9/29/20119/29/20119/30/2011 3:15:00 PM NR
ESC11-00326 Conference9/28/20119/29/20119/30/2011 7:48:16 AMPDONE
ACHD has diredted the push of fill soil at the outlet pipe of the drainage. Will be also stabilizing it with geotextile fabric with rip rap.
ESC10-00600 General Inspection9/29/20119/29/20119/29/2011 11:42:41 AM DONE
Permit finaled
ESC10-00600 DOC - Permit Finaled9/29/20119/29/20119/29/2011 11:42:20 AMPPASS
ESC11-00370 Aging Inspection9/29/20119/29/20119/29/2011 11:39:58 AM PASS
ESC11-00634 BMP Violation9/29/20119/29/20119/29/2011 8:54:09 AMAFAIL
Verbal to RP:
Must provide a "lined" concrete washout pit of a sealed external washout pit. Also Clean up all sediment and debris on all hard surfaces surrounding the project subdivision area. Will follow up for compliance on 9/30/2011PM.