Inspections for the day of: Tuesday, September 29, 2015.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-01708 ELE-Aging Inspection9/29/20159/29/20159/30/2015 2:18:44 PM DONE
Drove by and inspected.
ELE15-03122 Final9/29/20159/29/20159/29/2015 2:40:56 PMPPASS
Phone #: ###-#### Inspection requested via web by jamie berg Checked with contractor as to why the meter bases are failing at this location which seems to be a supply issue and it is being worked on to solve issue. Final ok
ELE15-03122 Permanent Service9/29/20159/29/20159/29/2015 2:28:14 PMPPASS
Phone #: ###-#### Inspection requested via web by jamie berg p/s u/g rec ok
ELE15-03082 Temporary Service9/29/20159/29/20159/29/2015 2:08:06 PMPPASS
Please contact Ryan ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Tracy Robertson t/s u/g n ok
ELE15-03081 Temporary Service9/29/20159/29/20159/29/2015 2:06:39 PMPPASS
Please contact Ryan ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Tracy Robertson t/s u/g n ok
ELE15-03083 Temporary Service9/29/20159/29/20159/29/2015 2:05:00 PMPPASS
Please contact Ryan ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Tracy Robertson t/s u/g n ok
ELE15-03079 Temporary Service9/29/20159/29/20159/29/2015 2:03:16 PMPPASS
Please contact Ryan ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Tracy Robertson t/s u/g n ok
ELE15-03080 Temporary Service9/29/20159/29/20159/29/2015 1:50:56 PMPPASS
Please contact Ryan ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Tracy Robertson t/s u/g n ok
ELE15-01917 Final9/28/20159/29/20159/29/2015 1:41:39 PMPPASS
Must call Tom access ###-####. Phone #: ###-#### Inspection requested via web by Mike Cole Seperate permit pulled for equipment. Offices ok occupy. Final ok
ELE15-03120 Electrical Rough-In9/29/20159/29/20159/29/2015 12:53:21 PMPPASS
We are requesting a wall rough-in inspection for today 9/29/15 in the afternoon. Our contact is Kory @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate Walls and hardlid rough in ok cover
ELE15-03112 Rough-In Permanent Service9/28/20159/29/20159/29/2015 11:37:59 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk Rough in ok cover p/s u/g n ok
ELE15-03090 Final9/28/20159/29/20159/29/2015 10:31:24 AMAPASS
This was a Saturday install, requested by the customer. It''s a small system that only took a few hours on Saturday, so I wasn''t able to schedule the rough-in inspection that is used for the listing check of the panels and inverters. However the listing specs are included in the building permit packet that is required on site.

12 solar panels.
AC micro-inverter system. No DC voltage.
Enphase M250 Micro-Inverters, that are CSA, IEEE-1547, and UL-1741 listed.
Ironridge Integrated Grounding System mid clamps, bonding straps and bonding lugs.
And 280 watt LG panels, ETL listed.

A single home run, in metal conduit, is ran from the solar array to the knife switch, located next to meter base. From the knife switch to breaker in main panel, at the top bottom of the busing, opposite the feeder lugs. The solar breaker and the knife switch are permanently marked for solar with engraved label plates, and the circuit numbers identified in the knife switch and on the panel schedule.

The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service ground in the main panel.

The main panel is in the garage, so give the homeowner a call for access at 253.224.7624

Thanks guys,
Ryan King
Phone #: ###-#### Inspection requested via web by Ryan King Final ok
ELE15-03090 Electrical Rough-In9/29/20159/29/20159/29/2015 10:31:06 AMPPASS
This was a Saturday install, requested by the customer. It''s a small system that only took a few hours on Saturday, so I wasn''t able to schedule the rough-in inspection that is used for the listing check of the panels and inverters. However the listing specs are included in the building permit packet that is required on site.

12 solar panels.
AC micro-inverter system. No DC voltage.
Enphase M250 Micro-Inverters, that are CSA, IEEE-1547, and UL-1741 listed.
Ironridge Integrated Grounding System mid clamps, bonding straps and bonding lugs.
And 280 watt LG panels, ETL listed.

A single home run, in metal conduit, is ran from the solar array to the knife switch, located next to meter base. From the knife switch to breaker in main panel, at the top bottom of the busing, opposite the feeder lugs. The solar breaker and the knife switch are permanently marked for solar with engraved label plates, and the circuit numbers identified in the knife switch and on the panel schedule.

The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service ground in the main panel.

The main panel is in the garage, so give the homeowner a call for access at 253.224.7624

Thanks guys,
Ryan King
Phone #: ###-#### Inspection requested via web by Ryan King Listing confirmed. rough in ok
ELE15-02482 Rough-In Permanent Service9/28/20159/29/20159/29/2015 9:40:19 AMAPASS
Phone #: ###-#### Inspection requested via web by Thomas Jenkins Service rough in ok p/s u/g n ok
ELE15-01067 Electrical Rough-In9/28/20159/29/20159/29/2015 9:16:13 AMAPASS
Remaining ceiling drop lids Phone #: ###-#### Inspection requested via web by kendall bender Grid complete rough in ok cover
ELE15-03101 Rough-In Permanent Service9/28/20159/29/20159/29/2015 8:55:11 AMAPASS
Phone #: ###-#### Inspection requested via web by Greg Traudt Rough in ok cover p/s u/g n ok
ELE15-03099 Final9/28/20159/29/20159/29/2015 8:54:23 AMACANC
Phone #: ###-#### Inspection requested via web by Greg Traudt Requested by mistake
ELE15-03099 Rough-In Permanent Service9/28/20159/29/20159/29/2015 8:53:46 AMAPASS
Phone #: ###-#### Inspection requested via web by Greg Traudt Rough in ok cover p/s u/g n ok
ELE15-02545 Electrical Rough-In9/28/20159/29/20159/28/2015 1:35:44 PMACANC
We are requesting a wall rough-in inspection tomorrow 9/29/15 in the early AM if possible. Our contact is Luke @ ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate