FIR15-00591
| INSP-Sprinkler Rough-in | 9/28/2015 | 9/29/2015 | 9/30/2015 6:48:26 AM | A | FAIL |
|
|
Installation for the most part is passed. I have concerns with a piping arrangement that does not match plan. Cam is going to discuss with Tim Frost.
|
FIR15-00640
| INSP-Sprinkler Rough-in/Hydro | 9/28/2015 | 9/29/2015 | 9/29/2015 2:04:53 PM | P | CANC |
|
|
United water has not provided water to site yet.
|
BLD15-00489
| FIRE-Final Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 1:49:43 PM | P | PASS |
|
|
life safety passed
|
BLD15-03486
| FIRE-Final Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 1:21:09 PM | P | FAIL |
|
|
Provide single action hardware for the southeast exit door. Repair the exit sign at the main exit and provide emergency lighting through out.
|
FIR12-00083
| INSP-Final Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 10:35:13 AM | P | PASS |
|
|
Permit finaled
|
BLD15-01868
| FIRE-Final Inspection | 9/28/2015 | 9/29/2015 | 9/29/2015 10:33:43 AM | A | FAIL |
|
|
All life safety is ok except for the existing fire alarm system needs to be modifed for the new wall arrangement.
|
FIR15-00570
| INSP-Sprinkler Rough-in | 9/22/2015 | 9/29/2015 | 9/29/2015 10:32:31 AM | A | PASS |
|
|
See my marked ups on plan sheet FP3 and FP4 for areas inspected. No insulation of the attic space or provisions for heat have been provided at this point.
|
FIR15-00297
| INSP-Supply line flush | 9/28/2015 | 9/29/2015 | 9/29/2015 10:03:16 AM | A | FAIL |
|
|
United water has not opened the valve. No flush performed.
|