BLD16-01109
| BLD-Energy code compliance | 9/28/2016 | 9/29/2016 | 9/29/2016 4:02:55 PM | P | PASS |
|
|
Chad Phone #: ###-####
|
BLD16-02711
| BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 3:38:01 PM | P | PASS |
|
|
Jim Phone #: ###-####
|
BLD16-02711
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 3:37:51 PM | P | PASS |
|
|
|
BLD16-03573
| BLD-Conference | 9/29/2016 | 9/29/2016 | 9/29/2016 3:13:23 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Cindy Zickgraf
|
BLD16-03573
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 3:13:14 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD16-02530
| BLD-Framing/Rough-in | 9/26/2016 | 9/29/2016 | 9/29/2016 2:39:14 PM | P | PASS |
|
|
James` Phone #: ###-####
|
BLD15-04035
| BLD-Framing/Rough-in | 9/29/2016 | 9/29/2016 | 9/29/2016 2:20:50 PM | P | PASS |
|
|
Duane Phone #: ###-####. Verified nuts on holdown and roof access hangars.
|
MIS16-00316
| BLD-Conference | 9/29/2016 | 9/29/2016 | 9/29/2016 1:51:17 PM | P | PASS |
|
|
|
MIS16-00316
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 1:51:09 PM | P | PASS |
|
|
A roofing permit has been obtained.
|
BLD16-01286
| BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 1:49:27 PM | P | NR |
|
|
Jake Phone #: ###-####. Needs fire/life/safety final. Also needs to provide special inspection report for anchors.
|
BLD16-01507
| BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 1:34:17 PM | P | NR |
|
|
Richard Phone #: ###-####. Life/safety final failed.
|
BLD16-03240
| BLD-Wall Bracing | 9/29/2016 | 9/29/2016 | 9/29/2016 1:16:49 PM | P | NR |
|
|
Zane Phone #: ###-####
|
BLD15-04407
| BLD-Conference | 9/28/2016 | 9/29/2016 | 9/29/2016 1:00:23 PM | A | DONE |
|
|
Meet with Ed at 11:30am to discuss handrail issues... Met with handrail fabricator to go over correction notice items.
|
BLD16-01767
| BLD-Framing/Rough-in | 9/27/2016 | 9/29/2016 | 9/29/2016 12:58:57 PM | A | CANC |
|
|
would like call ahead; Brian Phone #: ###-####
|
BLD16-01764
| BLD-Framing/Rough-in | 9/27/2016 | 9/29/2016 | 9/29/2016 12:58:42 PM | A | CANC |
|
|
would like call ahead; Brian Phone #: ###-####
|
BLD16-01763
| BLD-Conference | 9/28/2016 | 9/29/2016 | 9/29/2016 12:58:25 PM | A | CANC |
|
|
would like call ahead; Brian Phone #: ###-####
|
BLD14-03071
| BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 9:57:29 AM | A | PASS |
|
|
Cody// inspection for the 3rd Phone #: ###-####. units 107,108,207,208,307,308 ok to occupy only.
|
ESC16-01067
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 9:15:29 AM | A | PASS |
|
|
|
BLD16-02835
| BLD-Framing/Rough-in | 9/28/2016 | 9/29/2016 | 9/29/2016 9:15:09 AM | A | FAIL |
|
|
Phone #: 2085134849 >> Inspection requested via mobile web by Cody Walker. Foam all top plates at as pipe penetrations. Strap top plate break, 2nd. floor above stairs. Provide addtional nailing on beam pockets. Provide strap on incomplete beam pockets. Provide approved fix for jack trusses at front porch. ok to insulate. Correction notice posted.
|
ESC16-00756
| Site Final | 9/29/2016 | 9/29/2016 | 9/29/2016 8:49:57 AM | A | DONE |
|
|
|
ESC16-00756
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 8:49:45 AM | P | PASS |
|
|
|
BLD16-02056
| BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 8:48:58 AM | A | PASS |
|
|
Brett Phone #: ###-####
|
BLD16-02056
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 8:48:22 AM | P | PASS |
|
|
|
BLD16-03240
| BLD-Wall Bracing | 9/28/2016 | 9/29/2016 | 9/29/2016 8:44:33 AM | A | NR |
|
|
Shear // Zane Phone #: ###-####
|