ESC15-01161
| General Inspection | 9/28/2016 | 9/29/2016 | 9/30/2016 11:09:43 AM | A | CANC |
|
|
|
ESC15-00957
| General Inspection | 9/28/2016 | 9/29/2016 | 9/30/2016 10:46:54 AM | A | PASS |
|
|
Numerous SFHs in progress permitted seperately. No subdivion work remaining. DI bags installed. Concrete washout provided. No discharges or trackout from subdivision.
|
ESC16-00381
| General Inspection | 9/29/2016 | 9/29/2016 | 9/30/2016 10:06:08 AM | | PASS |
|
|
Earth disturbance complete and stabilized. Pool installed. ESC permit finaled.
|
ESC15-00541
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 2:56:22 PM | | PASS |
|
|
|
ESC16-00410
| Aging Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 2:24:46 PM | | PASS |
|
|
Remodel complete. No construction activity or materials on site. No disturbed area. ESC permit condtions satisfied.
|
ESC16-00410
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 2:24:09 PM | P | PASS |
|
|
|
ESC15-01287
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 2:01:31 PM | | CANC |
|
|
rescheduled for site final on 10/3
|
ESC15-01343
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 2:00:29 PM | | CANC |
|
|
|
ESC16-00397
| Aging Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 1:50:11 PM | | PEND |
|
|
No construction or demolition. Same findings as BLD inspector results. Foundation and driveways still onsite. No new BLD permit applications pending for parcel. No material leaving site, will continue to monitor. Vegetation and sidwalk surrounding foundation were undisturbed.
|
ESC16-00211
| Aging Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 1:40:08 PM | | PASS |
|
|
Home complete and landscaped. BLD finaled. ESC permit conditions satisified.
|
ESC16-00211
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 1:39:30 PM | P | PASS |
|
|
|
MIS16-00269
| ESC-Conference | 9/28/2016 | 9/29/2016 | 9/29/2016 12:24:49 PM | P | FAIL |
|
|
Complaint of working w/out permits.
Posted Stop Work Order notice on recently installed fence. No ESC BMPs, no permits, no site identification, no applications with City pending.
No one on site. Left phone #. Will investigate who owner is or if related to property above site.
|
ESC16-00603
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 12:09:34 PM | P | PASS |
|
|
Sediment basin construction/grading is complete. Fanned entrance to basin is lined with rip-rap. Slopes of basin have been horizontally tracked and pressurized low impact sprinkler irrigation has been installed. Veasy Seeding Inc. onsite apply dry seed mix of 8 native species intermixed with GrowGanics soil ammendment to provide nutrients to improve growth & soil biology. Today tacifier glue will dry and sprinkling will start tomorrow. No wattles need to be installed unless erosion issues, do not want to disturb the seed mix application.
No trackout, SWPPP posted. Appproved.
|
ESC15-00729
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 11:45:56 AM | | PEND |
|
|
Work has occurred on the Council Springs access road. Subgrade of road mix is compacted, to be finish in asphalt. No corrections at this time. Consulting with Hunter and Syman on control measure for runoff along road..
Examine hillside areas for seed growth after rains.
|
ESC15-01256
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 11:03:02 AM | | CANC |
|
|
|
ESC16-00958
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 11:02:51 AM | A | PASS |
|
|
WIP on frame. Permit posted. Sidewalk and gutter free of loose dirt. Trash contained. No corrections needed.
|
ESC16-00841
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 11:02:39 AM | A | PASS |
|
|
WIP on foundation and utility work. Crew on site watering area of excavation to keep dust down. Perimeter wattles installed and undisturbed. Permit posted. Approved.
|
ESC16-00145
| Aging Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 10:42:22 AM | | PASS |
|
|
|
ESC16-00489
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 10:41:34 AM | P | PASS |
|
|
Subdivision work is near complete. Currently preparing to install water line to Barber Drive. SWPPP info posted at Barnside and Timbersaw and inspections binder onsite with proper inspection reports. No issues noted by Syman Inspector.
All DIs have been fitted with filter bags. No SFH construction yet. Landscaping of sidewalk medians is complete. No fugitive dust issues observed at time of inspection. Approved.
|
ESC16-01147
| Site Preparation | 9/28/2016 | 9/29/2016 | 9/29/2016 10:34:47 AM | A | PASS |
|
|
Clint Phone #: ###-####
BMPs installed. Approved for construction
|
ESC15-01439
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 10:30:13 AM | P | PASS |
|
|
Home complete and landscaped/stabilized. Temp BMPs to remain during active construction in DHE
|
ESC15-01432
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 10:29:51 AM | P | PASS |
|
|
Home complete and landscaped/stabilized. Temp BMPs to remain during active construction in DHE
|
ESC15-01434
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 10:29:41 AM | P | PASS |
|
|
Home complete and landscaped/stabilized. Temp BMPs to remain during active construction in DHE
|
ESC15-01430
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 10:29:27 AM | P | PASS |
|
|
Home complete and landscaped/stabilized. Temp BMPs to remain during active construction in DHE
|
ESC16-01126
| Site Preparation | 9/28/2016 | 9/29/2016 | 9/29/2016 10:28:09 AM | A | PASS |
|
|
Clint Phone #: ###-####
Permit posted with contact details. Active homes in compliance. DI bags have plenty of capture capacity. No windblown trash or uncontained washouts observed. Designated lined washout provided. Approved.
|
ESC15-00862
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 10:14:59 AM | | CANC |
|
|
|
ESC13-00193
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 10:14:44 AM | | CANC |
|
|
|
ESC15-01224
| General Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 10:14:26 AM | | PASS |
|
|
WIP on Library structure. Curbing, paving and parking areas are complete. Some landscaping is also in progress. No dirt stockpiles or trackout on permeable paver drainage areas. Permit sign posted on trailer. Clean site.
|
ESC16-01348
| Site Preparation | 9/29/2016 | 9/29/2016 | 9/29/2016 9:00:52 AM | A | CANC |
|
|
spoke with homeowner RP Perry regarding ESC permit conditions. Contractor Saul will call for Site Prep early next week when ready to start project
|
ESC16-00419
| Aging Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 8:37:25 AM | | PASS |
|
|
Pool in backyard complete. No disturbed area or loose material on site. Culdesac is clean. All permits finaled.
|
ESC16-00419
| DOC - Permit Finaled | 9/29/2016 | 9/29/2016 | 9/29/2016 8:35:22 AM | P | PASS |
|
|
|
ESC16-00088
| General Inspection | 9/26/2016 | 9/29/2016 | 9/28/2016 3:14:16 PM | A | PASS |
|
|
WIP on interior finishes and exterior painting. No work occuring on large wall and below on the hillside. Driveway is not yet paved, no trackout at this time but will need construction entrance if it won't be paved/stabilized before November.
|
ESC15-00547
| General Inspection | 9/23/2016 | 9/29/2016 | 9/28/2016 11:26:15 AM | A | PART |
|
|
Further site corrections and clean up has occured. Excess dirt stockpile was removed. All DIs in sub and MS4 have sediment protection.
Corrections remaining: - remove trash from bins on east side of site - sweep entrance area, removed dirt from curb areas around crown.
|