PLM96-02302
| INSP - Plumbing Rough-in | 9/3/1996 | 9/3/1996 | 9/3/1996 12:00:00 AM | | PART |
|
|
/ / 330 - pumped OHF from subfab across roof to drop to repump station still need containment test.
|
PLM96-02385
| INSP - Plumbing Rough-in | 8/30/1996 | 9/3/1996 | 9/3/1996 12:00:00 AM | A | PASS |
|
|
09/03/96 330 -
|
PLM96-02302
| PLM - Partial final | 8/30/1996 | 9/3/1996 | 9/3/1996 12:00:00 AM | A | CANC |
|
|
09/03/96 330 - pump waste/ roof top system fab 4 phase 2 Andy called an
|
PLM96-02590
| INSP - Sewer and Water lines | 8/30/1996 | 9/3/1996 | 9/3/1996 12:00:00 AM | A | PASS |
|
|
09/03/96 330 - TEST WILL BE ON AT 10:30AM
|
PLM96-02547
| INSP - Plumbing Rough-in | 9/3/1996 | 9/3/1996 | 9/3/1996 12:00:00 AM | P | PASS |
|
|
09/03/96 330 - reinspection
|