Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD96-02800 INSP - Wall cover9/2/19979/3/19979/4/1997 12:00:00 AMAPART
09/03/97 340 - GROUTED, 12 YARDS 9/2/97 / WILL CALL 9/3/97/ AND LET YOU POURED TODAY. SPEC. INSPECTOR ON JOB SITE.
BLD97-00044 INSP - Carpentry9/3/19979/3/19979/4/1997 12:00:00 AMPPART
09/03/97 340 - W/ BLD970401...WIP
BLD97-00401 INSP - Carpentry9/3/19979/3/19979/4/1997 12:00:00 AMPPART
09/03/97 340 - BLDG 6; CHK C/N FOR FINAL...WIP,NEED REPORT ON CHEM ANALY PLAN CHK ITEMS
BLD97-00967 INSP - Final9/3/19979/3/19979/4/1997 12:00:00 AMPFAIL
09/03/97 340 - C/N, SMOKE DET'S, AIR SEAL
BLD97-01475 INSP - Carpentry9/2/19979/3/19979/4/1997 12:00:00 AMPPART
09/03/97 340 - #2 CLG GRID
BLD96-03178 INSP - Final9/2/19979/3/19979/3/1997 12:00:00 AMAFAIL
09/03/97 340 - SIDE GARAGE DOOR OPEN CALL DAIRLE TO MEET ###-####. 2ND C
BLD96-03189 INSP - Foundation9/2/19979/3/19979/3/1997 12:00:00 AMPPART
09/03/97 340 - EARLY P.M. IF POSSIBLE; MET W/ KEVIN ENGSTROM, P WKS. NEW CLOSURE FND FOR AERATION PIT AT N. SIDE. MTI ONSITE
BLD97-02309 INSP - Footings9/3/19979/3/19979/3/1997 12:00:00 AMPPART
09/03/97 340 - NO PLAN, LOOKS OK