BLD02-00276
| BLD-Conference | 8/29/2002 | 9/3/2002 | 9/6/2002 12:00:00 AM | P | CANC |
|
|
|
MIS02-00053
| BLD-Conference | 8/29/2002 | 9/3/2002 | 9/6/2002 12:00:00 AM | P | CANC |
|
|
|
BLD02-01978
| BLD-Final | 8/30/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | A | NR |
|
|
fn- opens at 9:00 stephanie- any questions call--###-#### ext 100...went in AM, unable to locate...recall 9/3/2002 4:38:41 PM
|
BLD02-00841
| BLD-Wall cover | 9/3/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 07:18:25. Contact: ###-####...partial, tunnel type stair enclosure at south side, upper floor ok to begin cover, need spec. insp reports for fabbbed steel stairs at ext. 9/3/2002 3:53:35 PM
|
BLD02-01256
| BLD-Other | 9/3/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 08:26:32. Contact: ###-####.
|
BLD02-01785
| BLD-Final | 9/3/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | P | DONE |
|
|
roof\\###-#### roof installed, looks ok 9/3/2002 3:54:32 PM, 9/3/2002 3:55:36 PM
|
BLD01-01860
| BLD-Conference | 9/3/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | P | PASS |
|
|
w/ Steve Jones...need permits in his name, approved plans, etc...needs to obtain all "trade" ok's for frame insp & verify shear panel nailing (or equal) 9/3/2002 4:00:28 PM
referred to tony & alan H. for more info 9/3/2002 4:01:26 PM
|
BLD02-01080
| BLD-Final | 8/29/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | P | NR |
|
|
FN MIKE ###-####...need elec? 9/3/2002 5:01:11 PM
|