PLM02-02216
| Plumbing Rough-in | 8/30/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/30/2002 at 14:08:49. Contact: ###-####.
|
PLM02-02702
| Plumbing Rough-in | 8/30/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | A | PASS |
|
|
gene- ###-####
|
PLM02-02703
| Plumbing Rough-in | 8/30/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | A | PASS |
|
|
gene- ###-####
|
PLM02-02680
| Plumbing Rough-in | 8/30/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/30/2002 at 17:26:28. Contact: ###-####.
|
PLM02-02663
| Plumbing Rough-in | 9/2/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/02/2002 at 12:44:14. Contact: ###-####.
|
PLM02-02697
| Final | 9/3/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 08:09:38. Contact: ###-####. need to provide premise protection pipe t&p to outside building cap off all open lines in crawl space cap off plumbing fixtures in abandon rest-room caulk fixfure,s to floor and wall 9/3/2002 4:51:37 PM
|
PLM02-02701
| Water and/or Sewer | 9/3/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | P | CANC |
|
|
mary ###-#### please call 1st canc. by mary 9/3/2002 5:09:06 PM
|
PLM02-02710
| Plumbing Rough-in | 9/3/2002 | 9/3/2002 | 9/3/2002 12:00:00 AM | P | FAIL |
|
|
jason- ###-#### r/i upc 2000 table 7-5 note 4 not to exceed 3 water closets on any hotizontal branch or drain fix leak on water service support water piping to washer box rehang hanger,s on drain line that fell down 9/3/2002 5:16:38 PM
|