FIR08-00321
| FIR-Aging Inspection | 9/3/2008 | 9/3/2008 | 9/4/2008 5:43:03 PM | | DEFR |
|
|
Work in progress.
|
FIR08-00114
| INSP-Final Inspection | 9/2/2008 | 9/3/2008 | 9/3/2008 5:10:02 PM | A | PASS |
|
|
Fire alarm system passed after repairs were made to a non functioning pull station and a NAC panel that was incorrectly wired. KR
|
FIR07-00495
| INSP-Final Inspection | 9/3/2008 | 9/3/2008 | 9/3/2008 4:20:40 PM | P | PART |
|
|
Final pending ceilings and escutcheons.
|
FIR08-00568
| INSP-Final Inspection | 9/2/2008 | 9/3/2008 | 9/3/2008 4:15:23 PM | P | PASS |
|
|
Fire alarm modifications passed field testing, permit finaled.
|
FIR08-00289
| INSP-Sprinkler Rough-in/Hydro | 9/3/2008 | 9/3/2008 | 9/3/2008 4:14:03 PM | P | FAIL |
|
|
Overhead hydrostatic testing failed due to visible system leakage at four locations.
|
FIR08-00364
| INSP-Alarm Testing | 9/3/2008 | 9/3/2008 | 9/3/2008 4:12:30 PM | A | NR |
|
|
Phone #: ###-####
|
FIR07-00928
| INSP-Sprinkler Rough-in/Hydro | 9/3/2008 | 9/3/2008 | 9/3/2008 4:11:23 PM | A | PART |
|
|
Rough-in at the dwelling units 3rd-6th floors only approved for cover, verified noted corrections have been completed for these areas.
|